50 likes | 183 Views
H2 Layout for EMU. a brief report of a couple of visits by Darin A., Jay R., and FG. H2 Layout. PC#1 plus add’l rack space. more rack space + room for desks. TTCmi/ex. gas pad. beam. H2 beam dump. ME1/1. ME1/1. HCAL. magnet. preferred location of CSCs.
E N D
H2 Layout for EMU a brief report of a couple of visits by Darin A., Jay R., and FG
H2 Layout PC#1 plus add’l rack space more rack space + room for desks TTCmi/ex gas pad beam H2 beam dump ME1/1 ME1/1 HCAL magnet preferred location of CSCs • Available rack space in Bats. HNA360, 363 and possibly 370 (TTC) • Desk space available in Bat. HNA363 • fast cables between H2 TTCmi/ex rack (HNA370) and available rack space in HNA360. • Fast and wireless networks available • Gas lines and hook-ups available • need to add multiple concrete blocks for the CSC constellation H2 Layout for EMU
cable tray main CSC location an artist’s impression … concrete block need more of those … H2 Layout for EMU
Gas hook-ups gas pad patch panel • Available space on the mezzanine gas pad • Available (and labeled) gas lines • Patch panels in the beam area H2 Layout for EMU
Open Issues • ME1/1 location • directly behind HCAL • quantify punch through, but at higher rates? • timing issue? • PC location likely to be inside the beam area. • in conjunction with the other 3 chambers • similar set-up as previous EMU Slice Test • compact set-up beneficial for timing • TTC setup • install 6U crate close to TTCmi (HN370) • use fast cables • split fiber signal and install TTC crate in HN360 • Safety requirements regarding the “CSC floor” • too many concrete blocks may block access to a search box behind the beam dump H2 Layout for EMU