H2 Layout for EMU

H2 Layout for EMU. a brief report of a couple of visits by Darin A., Jay R., and FG. H2 Layout. PC#1 plus add’l rack space. more rack space + room for desks. TTCmi/ex. gas pad. beam. H2 beam dump. ME1/1. ME1/1. HCAL. magnet. preferred location of CSCs.

tamas
Download Presentation

H2 Layout for EMU

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. H2 Layout for EMU a brief report of a couple of visits by Darin A., Jay R., and FG

  2. H2 Layout PC#1 plus add’l rack space more rack space + room for desks TTCmi/ex gas pad beam H2 beam dump ME1/1 ME1/1 HCAL magnet preferred location of CSCs • Available rack space in Bats. HNA360, 363 and possibly 370 (TTC) • Desk space available in Bat. HNA363 • fast cables between H2 TTCmi/ex rack (HNA370) and available rack space in HNA360. • Fast and wireless networks available • Gas lines and hook-ups available • need to add multiple concrete blocks for the CSC constellation H2 Layout for EMU

  3. cable tray main CSC location an artist’s impression … concrete block need more of those … H2 Layout for EMU

  4. Gas hook-ups gas pad patch panel • Available space on the mezzanine gas pad • Available (and labeled) gas lines • Patch panels in the beam area H2 Layout for EMU

  5. Open Issues • ME1/1 location • directly behind HCAL • quantify punch through, but at higher rates? • timing issue? • PC location likely to be inside the beam area. • in conjunction with the other 3 chambers • similar set-up as previous EMU Slice Test • compact set-up beneficial for timing • TTC setup • install 6U crate close to TTCmi (HN370) • use fast cables • split fiber signal and install TTC crate in HN360 • Safety requirements regarding the “CSC floor” • too many concrete blocks may block access to a search box behind the beam dump H2 Layout for EMU