An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Discussion is without prejudice to BT’s position with respect to Option 2 Access To Bandwidth Option 2 Product Definition Discussion

  2. Agenda • Possible Product components • Availability • Co-location • Basic Product • Metallic Path • Conclusion

  3. Possible Product components Virtual co-location Node

  4. Availability • Available to Public Telecommunications Operators • Available at BT Exchange Areas: • with long-term future. • with metallic pairs. • with appropriate competitive environment?.

  5. Co-location General • Virtual co-location(offsite) or • Dedicated Operator room, minimum 25 sq m?. • Where space limited • First come, First served. • What ancillary service obligations? • IN: lighting, heating, general utilities, air-conditioning. • OUT: DC power, stand-by facilities, racks, cable runways, distribution frames.

  6. Property Law applies BT retains rights of property use. Advance payments for major construction/ building alterations. Landlord deposit, minimum term?. No sub-leasing. Termination conditions. Co-location Applicable contract

  7. Co-location Operator Obligations • Use equipment that conforms to Spectrum management plan. • Equipment haulage. • Health & Safety, EMC. • Rubbish & waste removal.

  8. Co-location Backhaul Access • No Operator access to BT ducts. • Options: • Metallic path extension ( tie-cable). • In-Span Handover outside the Exchange. • Leased circuit(eg. 2MB) from BT.

  9. Co-location Site visits • Operator to provide reasonable notice of visit. • Operator Agent escorted by BT. • No access to Exchange MDF. • Emergency visits - reasonable endeavours.

  10. Basic Product • Metallic path. • Broadband only(greater than 128kbit/s)?. • Residential and SME End-users only?. • How does Product relate to basic Telephony? • Incremental to Telephony pair(not necessarily BT’s). • Effect on Universal Service Obligation?. • Technical difficulties pair sharing with BT Telephony.

  11. Service demarcation points: at End-user premises; NTP. At BT Node = ( OLO Room, NOT MDF) No customer wiring by BT. State of path on handover Pre-tested estimate of distance. No guarantees on future performance. Metallic path(1)

  12. Contractual relationship between Operator and BT. QOS parameters? Timescale to provide path/ repair? Spectrum management plan? How to police & enforcement rights. Exchange Area Data obligations? Post Codes served? Metallic path(2)

  13. Industry process required: End-user handling during transfer between Operators Link metallic path orders to co-location and Backhaul. Testing/Fault maintenance responsibility? Test access points & their availability? Metallic path(3)

  14. High level of automation required. CSS lead-time constraints. New systems design & lead time constraints. Operational Processes (incl. Billing)

  15. Operationally complex Definition needs to be agreed & reference offer developed. Once agreed, Define Trial, Run Trial & reflect trial experience in operational processes/systems. Challenging implementation timescale. Conclusion