Ventilation monitoring Tcc8/ecn3. Implementation. 3 Phases 2012 Technical run 2014 + Run with old HVAC /w physical separation 2015 + (?) New HVAC. Phase 1: Test Run. New system will not be delivered for 2012
E N D
Ventilation monitoring Tcc8/ecn3 11/07/2012
Implementation • 3 Phases • 2012 Technical run • 2014+ Runwithold HVAC /wphysicalseparation • 2015+ (?) New HVAC
Phase 1: Test Run • New system will not be delivered for 2012 • Use of old (but reliable!) system with differential chamber, mechanical registers and connection to the Area Controller (ARCON)
Gasextraction No rad. releases • UACV1-152 Ventilation ECN3 PV 8700m3/h GV 15300m3/h • UACV1-153 Ventilation GHN-300 PV 3000m3/h GV 4700m3/h • UACV1-154 Ventilation TCC8 PV 5400m3/h GV 8800m3/h
Phase 1: A temporary solution • Quality of samplingmay* not besufficient • Aspiration of air may have to berevised • Long tubing withbends • Short LivedGases: decay in the sampling tube • Particles: Losses in the long straight sections and bends, tubing materialmay not beadequate • Plastic tubing *to becalculated SEE template for presentations
2014+ Run • New stations (+Bungalow?)