An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ventilation monitoring Tcc8/ecn3 11/07/2012

  2. Implementation • 3 Phases • 2012 Technical run • 2014+ Runwithold HVAC /wphysicalseparation • 2015+ (?) New HVAC

  3. Phase 1: Test Run • New system will not be delivered for 2012 • Use of old (but reliable!) system with differential chamber, mechanical registers and connection to the Area Controller (ARCON)

  4. Gasextraction No rad. releases • UACV1-152 Ventilation ECN3 PV 8700m3/h GV 15300m3/h • UACV1-153 Ventilation GHN-300 PV 3000m3/h GV 4700m3/h • UACV1-154 Ventilation TCC8 PV 5400m3/h GV 8800m3/h

  5. Phase 1: A temporary solution • Quality of samplingmay* not besufficient • Aspiration of air may have to berevised • Long tubing withbends • Short LivedGases: decay in the sampling tube • Particles: Losses in the long straight sections and bends, tubing materialmay not beadequate • Plastic tubing *to becalculated SEE template for presentations

  6. 2014+ Run • New stations (+Bungalow?)