TDK Europe: Quality and Environmental Assurance. Claim handling system. 20/06/07. TDK business. Activity: TDK is dealing in a Buy and Sell model: -We purchase goods mostly in Far East and Middle East area
E N D
TDK Europe: Quality and Environmental Assurance Claim handling system 20/06/07
TDK business Activity: TDK is dealing in a Buy and Sell model: -We purchase goods mostly in Far East and Middle East area -Goods are mostly Optical discs products (CD-R, DVD’s) but also electronic equipments such as Speaker systems, headphones sets, USB devices as well as Batteries and accessories.
TDK business Activity: TDK is performing Repackaging activities at Bascharage facility -TDK can repack any kind of product. Promotional items, specific packing or palletizing. Those customized packaging are done in our facilities.
TDK QA activities Activity: we do -Product evaluation and homologation process -Manufacturing Lines evaluation -OQC report analysis -Receiving inspection -Supplier’s audit During those various product evaluation phases, problems are sometime encountered: claim has to be addressed to the supplier.
Claim to supplier handling TDK has developed its own database so called the “Non conformity database” on Lotus Notes. This database allows: -to issue “DQR” (Defect Quality Report) -to issue “Special go” -to issue “QPR” (Quality Problem Report) -in ISO 9001 environment, it allows to handle AFU’s (Audit Follow Up)
Non Conformity Database Several kind of documents and Processes can be driven through the Non Conformity database. Let’s proceed a DQR and follow the different steps and phases. The DQR initially developed as a tool for Manufacturing Process can easily be used in a Buy and Sell model company.
DQR report: phase 1 Phase 1: the DQR is issued: -Problem description -Responsible -Concerned Product and Quantity
Phase 2: WH confirm quantity -product from another delivery might be concerned -purpose: define the exact lot size DQR report: phase 2 Time frame is fixed. In case of delay, notification Emails are generated
DQR report: phase 3 Phase 3 : WH has confirmed quantity and DQR approved by Issuer’s Manager Quantity is revised based on lot size confirmation by W/H
DQR report: phase 4 Phase 4 : QA Dept is informed and take decision about product usage or rejection
DQR report: phase 5 Phase 5 : Once QA decision is taken, Purchasing Dept is now in charge of DQR coordination. Two steps: 1.technical 2.Financial Purchasing Dept inform the Supplier, who has to give feedback
DQR report: phase 6 Phase 6 : A mail is sent to the responsible supplier in order to get technical feedback
DQR report: phase 7 Phase 7 : the responsible supplier returns his technical comments(cause + CAR) to TDK and TDK QA approves it
DQR report: phase 8 Phase 8 : Product cannot be sold. A financial compensation process is launched. A credit note is issued . All related concerned cost to TDK can be indicated
DQR report: phase 9 Phase 9 : A mail is generated to the responsible supplier for CN processing
DQR report: phase 10 Phase 10 : The Credit Note is accepted and settled by the supplier
DQR report: phase 11 Phase 1 : The Credit Note being settled, product can be either: -trashed or -returned Once done, products are removed in the ERP system, DQR is closed by QA Dept
DQR continous follow up Analysis are possible. In the database, sorting is possible by: -supplier -Product category -date -status…. The status of DQR Process can be checked or reviewed at any time by people having access to the database Each steps are described and status visible
As a result of close communication and follow up of our suppliers: -25 to 30 millions discs are purchased monthly -5% of delivered lots are controlled -3 DQR’s in average are generated per month -Claim ratio is below 10 ppm