130 likes | 313 Views
HERSCHEL / PLANCK QPM CANNES JULY 03. “Team building” on Wednesday 16 evening Plenary session presentation : based on PDR kick off presentation , to be focussed on changes versus PDR baseline (design, performance & verification), achievements & short term milestones. Plenary session
E N D
HERSCHEL / PLANCK QPM CANNES JULY 03
“Team building” on Wednesday 16 evening • Plenary session presentation : based on PDR kick off presentation , to be focussed on changes versus PDR baseline (design, performance & verification), achievements & short term milestones
Plenary session • Tuesday 15, from 09:00. System / module part 1. Room Auditorium . All • Welcome 10’ • Introduction 10’ • Industrial aspects 10’ • Mission aspects 15’ • EFE status • telescopes 30’ (ESA) • instruments 30’ (ASP) • System design & performance 60’ • Tuesday 15, from 14:00. System / module part 1. Room Auditorium . All • Herschel PLM design & performance 60’ • Planck PLM design & performance 60’ • SVM design & performance 60’
Plenary session • Wednesday 16, from 09:00. System part 2. Room Auditorium . All • System AIV 60’ • H PLM AIT 30’ • SVM AIT 30’ • PA / configuration 30’ • Parts procurement 30’ • Schedule 30’
Instruments related splinters • Wednesday 16 , from 14:00. . Room Saturne V02. All • Instruments schedule & deliveries H & P • Thursday 17 , from 14:00. . Room Atlas V04-311.All • 14:00-16:00 Instruments interfaces management H & P • 16:00-18:00 Herschel and Planck open points • Herschel: H PI’s / ESA / ASP / ASED H Level 0 Cryo-harness Straylight • Planck : P PI’s / ESA / ASP (room Hyperion Y04-125) LFI / HFI FPU integration
FDIR splinter • Wednesday 16, from 14:00. Room Atlas V04-311 ESA / ASP / ALS/ SAAB/ DS • ………..
Management & project control splinter • XXXXXX , from 9:00. Room Capella Y01-217
Herschel PLM / SVM interfaces splinter • Wednesday 16 , from 14:00. Room Hyperion Y04-125ESA / ASP / ASED / ALS • WIH / cryo-harness / SVM harness interfaces • STR accommodation
Herschel PLM & S/S progress splinter • Thursday 17 , from 9:00. Room Saturne V02ESA / ASP / ASED • PLM critical / open areas • S/S status • Interfaces • lower level reviews • module AIV • AOB
SVM & S/S progress splinter • Thursday 17, from 9:00. Room Atlas V04-311ESA / ASP / ALS • SVM critical / open areas • S/S status • Interfaces • SOHO case • lower level reviews • module AIV • AOB
PPLM progress splinter • Thursday 17, from 9:00. Room Hyperion Y04-125ESA / ASP • PPLM critical / open areas • S/S status • Interfaces • lower level reviews • module AIV • AOB
Avionics splinter • Thursday 17 , from 14:00. Wrap up. Room Saturne V02 .All • BSW Consolidation Plan • Status • Open points / proposals • FDIR (ALS) : Progress since avionics review • ACMS : Reconfiguration duration and impact on ACMS • TM allocation • Traceability • Schedule • Logic diagram • ISVV • SVF • Avionics review closure