HERSCHEL / PLANCK QPM CANNES JULY 03

HERSCHEL / PLANCK QPM CANNES JULY 03. “Team building” on Wednesday 16 evening Plenary session presentation : based on PDR kick off presentation , to be focussed on changes versus PDR baseline (design, performance & verification), achievements & short term milestones. Plenary session

tan
Download Presentation

HERSCHEL / PLANCK QPM CANNES JULY 03

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HERSCHEL / PLANCK QPM CANNES JULY 03

  2. “Team building” on Wednesday 16 evening • Plenary session presentation : based on PDR kick off presentation , to be focussed on changes versus PDR baseline (design, performance & verification), achievements & short term milestones

  3. Plenary session • Tuesday 15, from 09:00. System / module part 1. Room Auditorium . All • Welcome 10’ • Introduction 10’ • Industrial aspects 10’ • Mission aspects 15’ • EFE status • telescopes 30’ (ESA) • instruments 30’ (ASP) • System design & performance 60’ • Tuesday 15, from 14:00. System / module part 1. Room Auditorium . All • Herschel PLM design & performance 60’ • Planck PLM design & performance 60’ • SVM design & performance 60’

  4. Plenary session • Wednesday 16, from 09:00. System part 2. Room Auditorium . All • System AIV 60’ • H PLM AIT 30’ • SVM AIT 30’ • PA / configuration 30’ • Parts procurement 30’ • Schedule 30’

  5. Instruments related splinters • Wednesday 16 , from 14:00. . Room Saturne V02. All • Instruments schedule & deliveries H & P • Thursday 17 , from 14:00. . Room Atlas V04-311.All • 14:00-16:00 Instruments interfaces management H & P • 16:00-18:00 Herschel and Planck open points • Herschel: H PI’s / ESA / ASP / ASED H Level 0 Cryo-harness Straylight • Planck : P PI’s / ESA / ASP (room Hyperion Y04-125) LFI / HFI FPU integration

  6. FDIR splinter • Wednesday 16, from 14:00. Room Atlas V04-311 ESA / ASP / ALS/ SAAB/ DS • ………..

  7. Management & project control splinter • XXXXXX , from 9:00. Room Capella Y01-217

  8. Herschel PLM / SVM interfaces splinter • Wednesday 16 , from 14:00. Room Hyperion Y04-125ESA / ASP / ASED / ALS • WIH / cryo-harness / SVM harness interfaces • STR accommodation

  9. Herschel PLM & S/S progress splinter • Thursday 17 , from 9:00. Room Saturne V02ESA / ASP / ASED • PLM critical / open areas • S/S status • Interfaces • lower level reviews • module AIV • AOB

  10. SVM & S/S progress splinter • Thursday 17, from 9:00. Room Atlas V04-311ESA / ASP / ALS • SVM critical / open areas • S/S status • Interfaces • SOHO case • lower level reviews • module AIV • AOB

  11. PPLM progress splinter • Thursday 17, from 9:00. Room Hyperion Y04-125ESA / ASP • PPLM critical / open areas • S/S status • Interfaces • lower level reviews • module AIV • AOB

  12. Avionics splinter • Thursday 17 , from 14:00. Wrap up. Room Saturne V02 .All • BSW Consolidation Plan • Status • Open points / proposals • FDIR (ALS) : Progress since avionics review • ACMS : Reconfiguration duration and impact on ACMS • TM allocation • Traceability • Schedule • Logic diagram • ISVV • SVF • Avionics review closure

  13. Friday 18 , from 9:00. Wrap up. Room Saturne V02 .All