1 / 5

SPURS-1 Results: Validating Aquarius

SPURS-1 Results: Validating Aquarius. In Situ Platforms. Aquarius Satellite. 0.2 m. 6 m. Wave gliders: propelled by waves. 150-km. 60-km. 90-km. 390 Km (242 Mi ). 0.5 m. 0.75 m. Weekly, 1 cm. Drifters: free drifting. Mooring: Fixed point.

tana-moss
Download Presentation

SPURS-1 Results: Validating Aquarius

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SPURS-1 Results: Validating Aquarius In Situ Platforms Aquarius Satellite 0.2 m 6 m Wave gliders: propelled by waves 150-km 60-km 90-km 390 Km (242 Mi) 0.5 m 0.75 m Weekly, 1 cm Drifters: free drifting Mooring: Fixed point

  2. Vertical Stratification:Wave GliderCTD-1 (0.2 m) vs. CTD-2 (6 m) RMS=0.076 psu 0.2 m 6 m Wave Glider 2

  3. Sub-Footprint (150-km) Variability

  4. Sub-Weekly Variability

  5. 150-km Weekly SSS: Aquarius vs. SPURS

More Related