An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Solar Express Year-End ReviewLeslie Moynihan January 13, 2014

  2. Why a Solar Program? • Promote solar as an energy resource • Educate our community • Build infrastructure within Snohomish County • Reduce market barriers • Support our Customers Renewable Energy Leadership! Photo Credit: Sebelsky Installation by Western Solar

  3. Solar Express Program Overview Cash Incentives • Available to all PUD Customers • PV:$500/kW up to: • $2,500 (residential) • $10,000 (commercial) • SHW:$500/system • Existing electric water heater Low Interest Loans • 2.9% Financing available through 2013 • Cannot be combined with cash incentive Project Requirements • Pre-approval, registered installer, > 75% TSRF Photo credit: Clark Installation by Fire Mountain Solar

  4. Solar Express- Funding

  5. Solar Express – # of projects by funding type

  6. Solar Express Number of New Projects by Technology New kW Installed per Year

  7. Solar Express- New Installations 2013 2013 Specs • 112 Residential • 8 Commercial Avg Residential Size: 5.3 kW Avg. Non-WA Cost: $4.11 /W Avg. WA-Made Cost: $5.85/W 77% use WA-made modules

  8. All Net-Metered Systems to Date 2.3 MW Adding 1 distributed generator every 3 days.

  9. Production Data 300 systems installed prior to July 2013 • Generated 1,300 MWhs July 2012- June 2013 • Administered $311,500 for those MWhs (12% of our annual limit, up from 5.5% in 2012) 400 systems by December 31, 2013 • Generated 1,767 MWhs in 2013 • Average annual production per kW: 936 kWh • Average for systems with batteries: 634 kWh

  10. Other Accomplishments • Aggregated 824 Solar RECs for meeting our I-937 target resources in 2012. 1414 SRECs in 2013. • Participated in DOE SunShot Initiative to reduce interconnection barriers • Planet Power participants funded 4 new demo projects (42 kW)

  11. Thank You! Leslie Moynihan Program Manager, Customer Renewables 425-783-8289 LGMoynihan@snopud.com Photo Credit: Kemp West, installed by NW Wind and Solar