RHM - ADAMS MISSION CHURCH BUILDING PROJECT. AFM Folweni Manase Branch. Phase I Erecting the steel structure with roof and isolated ceiling. The vacant site in Manase (Adams Mission). The Team from G auteng arrives The o ff l oading b egins.
E N D
RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM FolweniManase Branch
Phase IErecting the steel structure with roof and isolated ceiling.
Like puzzle pieces... The components of the structure is laid out
Phase IIAdding the side pannels (shade netting) • During the next two weeks we will be preparing the temporary side pannels made of sheet netting. These pannels will be added on all sides of the structure and will basically work like window blinds.
Phase IIIFloor slab • The local church will start raising funds to pour the floor slab. In the meanwhile the ground will just be levelled completely and compacted. This will allow them to use the church even without the cement floor being in place.
Phase IVBuilding the permanent outer walls. • The last phase will be the building of permanent outer walls. Funds will be raised to buy building blocks for this purpose