1 / 9

CONOPS BOILER PLATE

CONOPS BOILER PLATE. Candidate (its all about the data). Table of Contents. Operation View ( DoDAF OV-1) Time Sequence of use Stakeholders Operations Descriptions Component Descriptions Use Case Sequence Diagrams Data ETLs Reports. OV-1. Some interesting words

tanuja
Download Presentation

CONOPS BOILER PLATE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CONOPS BOILER PLATE Candidate (its all about the data)

  2. Table of Contents • Operation View (DoDAF OV-1) • Time Sequence of use • Stakeholders • Operations Descriptions • Component Descriptions • Use Case Sequence Diagrams • Data ETLs • Reports

  3. OV-1 Some interesting words About the intent of the System described and who For: Scheduling constraints from daily activities And the needs of the organization must Be reconciled to achieve success Students and Professors Need to be matched to Provide consistency and Progress In research Label Label Cats and Dogs Constraints and inputs Picture of the universe that is effected And then over lay with what you Are building Cats and Dogs Solution users Label Label Server Label Reports Label Label DB DB Label Some form of take away message that will resonate with the users and owners

  4. Time Sequence of Use Spiral Development Prototype Development And operations refinement Spiral Development Spiral Development Spiral Development Framework Design CONOPS Framework Development Planning Requirements Spiral Requirements Spiral Requirements Spiral Requirements Spiral Requirements Spiral Requirements Highlite what is going to happen to this system over its life cycle It eventually goes to full operation, or proof of concept, and then Is operated and maintained until retired, replaced or removed etc..

  5. Stakeholders • Name and Function: • what the stakeholder is concerned about. • How the stakeholder interfaces to the system • When and in what sequences • Name and Function: • There are many stakeholders including the developers, testers, acceptance, quality, reviewers, etc…

  6. ComponentsThese show up in the next diagrams • Component 1: • Input handlers – is this fed by an external system transaction or data base transfer, or is there manual entry, or is it paper tape. • Component 2: • Data Handlers • Component 3: • Software

  7. Sequence Diagram C1 C2 C3 C4 C5 Drive out the data in the sequence diagram and identify it for the next diagram.

  8. ETL Diagram F1 F2 F3 F4 F5 Describe operation C1 C2 C.. c..

  9. Reports • Data Centered attribute linked • Formats – display, print • Web Pages in prototype

More Related