1 / 2

Lifecycle Relationships

Lifecycle Relationships. SDLC. System Initiation. System Requirement Analysis. System Design. System Construction. System Acceptance. System Implementation. Validated Business Requirements & Models. Integration & System Test Results. Acceptance Test Results. Deploy System.

tanuja
Download Presentation

Lifecycle Relationships

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lifecycle Relationships SDLC System Initiation System Requirement Analysis System Design System Construction System Acceptance System Implementation ValidatedBusiness Requirements & Models Integration & System Test Results Acceptance Test Results Deploy System ValidatedSolution System Prototype ProjectManagement Project Plan Origination Initiation Planning Execution & Control Closeout BPM Current Environment Report Best Practice Report Target Environment Report Deploy Processes Current Environment Analysis Best Practice Research Target Environment Definition Process Construction Implementation Continuous Improvement

  2. Business Process Management Lifecycle Current Environment Analysis Best Practice Research Target Environment Definition Process Construction Implementation Continuous Improvement Prepare for Current Environment Analysis Prepare for Best Practices Research Define the Target Environment Build Processes Refine Implementation Strategy Transition to Performing Organization “To-Be” Models Key inputs, Outputs, Deliverables Define Performance Measures Create Performance Measurement System Develop Process Goals Build Performance Measurement System Develop Continuous Improvement Approach Conceptual Design Detailed Design Conduct Best Practices Research Document Current Environment Conduct Gap Analysis Test and Validate Processes Implement Business Processes “As-Is” Models Fit-Gap Report Prototype, Simulation, Pilot Results Deployed Processes Execute Continuous Improvement Activities Perform Data Analysis Produce Business and System Requirements Develop Implementation Strategy Finalize and Issue Report Refine User and Training Materials Produce User and Training Materials Validate the Current Environment Validate the Target Environment Current Environment Report Best Practices Report Target Environment Report User and Training Materials Refined Materials Revised 3-13-07

More Related