1 / 5

Foamed Asphalt Working Group

Foamed Asphalt Working Group. Road Pavements Forum 13 November 2001. Origin of workgroup. 2000 Phase I testing of foamed bitumen and emulsion- treated material HVS and initial laboratory test results available towards end of year 2001

Download Presentation

Foamed Asphalt Working Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Foamed Asphalt Working Group Road Pavements Forum 13 November 2001

  2. Origin of workgroup • 2000 • Phase I testing of foamed bitumen and emulsion- treated material • HVS and initial laboratory test results available towards end of year • 2001 • Late January 2001, Gautrans workshop to disseminate results • Steering committee selected at workshop • Feedback at RPF in May, steering committee becomes an RPF working group (advisory role) • Sabita funding, two additional members invited • Phase II of guidelines managed by AsAc

  3. Workgroup members • E Sadzik • E Fletcher/ T Lewis • K Jenkins • D Collings/ J du Plessis • I van Wijk/ J Calitz • N v d Walt • A Ungere • J Grobelaar • M White • H Loots • M Henderson • W Reusch • D Vietze • L Sampson (coordinator)

  4. Function • Provide direction on foamed bitumen treatment RDI • Review outputs from RDI process

  5. Output

More Related