1 / 20

ท่าเรือแหลมฉบัง

ท่าเรือแหลมฉบัง. ประตูสู่ภาคพื้นเอเชียตะวันออกเฉียงใต้. Welcome To Laem Chabang Port Gateway to South East Asia. 1.Overview of Laem Chabang Port. 130 Km. from Bangkok. 95 Km. from Suvarnabhumi Airport. LaemChabang Port. 20 Km. to Pattaya. Port Performance.

taran
Download Presentation

ท่าเรือแหลมฉบัง

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ท่าเรือแหลมฉบัง ประตูสู่ภาคพื้นเอเชียตะวันออกเฉียงใต้ Welcome ToLaemChabang Port Gateway to South East Asia

  2. 1.Overview of Laem Chabang Port 130 Km. from Bangkok 95 Km. from Suvarnabhumi Airport LaemChabang Port 20 Km. to Pattaya

  3. Port Performance

  4. Number of Vessel 1991 -2011 ปี

  5. Number of Car Handling at LCP 2002 - 2011

  6. มาตรการรักษาความปลอดภัยมาตรการรักษาความปลอดภัย

  7. Pocket PC & GPS

  8. Mobile X-Ray

  9. What fruit ? Export cargo Declared: Durian

  10. What fruit ? Export cargo Declared: Banana

  11. Megaports Initiative • The project cooperation between The United States Department of Energyand The Customs Department of Thailand • The objective is to findradiation from the containersfor commercial stabilizationmaritime andto protect the international terrorists for MagaPorts

  12. Single Rail Transfer Operator Project Capacity : 2 Million TEUs

  13. Conceptual Design for Setting Up Rail Mounted Gantry Crane to Operate 6 Tracks at LCP

  14. Container Throughput 1991-2011

  15. Port Development & Port Performance 2.1 Phase I Project 2.2 Phase II Project 2.3 Phase III Future Project

  16. Total Capacity of Basin I - Basin III • - Basin I = 4.00 million TEUs/Yr. • Basin II = 6.80 million TEUs/Yr. • Basin III = 8.00 million TEUs/Yr. • Basin I+II+III = 18.80 million TEUs/Yr.

More Related