1 / 22

Aviation Update

Aviation Update. Kurt Kleiner BLM OR/WA State Aviation Manager Office: 503.808.6593 Cell: 971.338.3091. Aaron Schoolcraft PNW/AK Regional Aviation Officer Office: 503.808.2359 Cell: 202.302.4518. Aviation Update (Priorities). Hiring Regional Aviation Group

tareq
Download Presentation

Aviation Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aviation Update Kurt Kleiner BLM OR/WA State Aviation Manager Office: 503.808.6593 Cell: 971.338.3091 Aaron Schoolcraft PNW/AK Regional Aviation Officer Office: 503.808.2359 Cell: 202.302.4518

  2. Aviation Update (Priorities) • Hiring Regional Aviation Group • One (1) Aviation Maintenance Division Manager • One (1) Aviation Safety Inspector – Airworthiness • Three (3) Airplane Pilots • One (1) Helicopter Program Manager • One (1) Air Attack Group Supervisor Program Coordinator • Forest and District Hiring • Two vacant UAO’s, another one vacant this fall • Facilities- base infrastructure improvements needed at many locations

  3. Aviation Update (Priorities) • PNW/AK Aviation Program Consolidation • PNW Primary Mission: Fire • Alaska Primary Mission: Transportation • Implement Alaska Road Map • PNW/AK Aviation Strategic Plan • Five (5) Year Plan • Safety Management Systems Approach • Aviation Programs • Budgets • Aircraft Composition • Oversight

  4. Aviation Update (Priorities) • Partnerships • Forest Service/DOI/Cooperators • New members of PNWCG Aviation Working Team • Program and Preparedness Reviews • DOI/BLM Program Evaluation (May13-17) • BLM National Fire Preparedness Review OR-WA • Aerial Supervision • Plan for 2013 and beyond • Helicopter Extraction • Plan for 2013 and beyond

  5. Aviation Update • Rotor-Wing Assets • Rotor-wing similar to 2012 • R6: Additional Type 1 in Grants Pass • Fixed-Wing Assets • Light fixed-wing assets should stay the same in 2013 • No change in PNW/AK • Airtankers potential for change

  6. Oregon BLM Aircraft • Lakeview District • Type 2 helicopter and crew, 1 exclusive use SEAT • Burns District • Type 3 helicopter and crew (new contract) • Vale District • Type 3 helicopter and crew, 1 exclusive use SEAT • Air Attack (Commander 690) with ATGS (& trainees) • BLM National SEAT Fleet- 18 additional exclusive use aircraft, managed in pairs (contract not yet awarded)

  7. Aviation Update • Type I Helicopters (Forest Service) • 34 Exclusive Use • 5 Exclusive Use in Region 6 • 57 Call-When-Needed • Type II Helicopters (Forest Service) • 33 Exclusive Use • 6 Exclusive Use in Region 6 • 78 Call-When-Needed • Type III Helicopters (Forest Service) • 59 Exclusive Use • 4 Exclusive Use in Region 6 • 171 Call-When-Needed

  8. Aviation Update • Helicopter Night Operations (HNO) • Contract one (1) helicopter in Region 5 (2013) • HNO Study recommended missions: • Water and retardant drops using a ground-filled fixed tank • Aerial supervision • Aerial ignition with Plastic Sphere Dispenser (PSD) • Emergency Medical Transport (EMT) using a hoist • Aviation Business Case (ABC) • ABC supports purchase of two helicopters

  9. Airtanker Program • Airtanker Contracts • Current Contract (9 Line Items) • Extended until April 22, 2013 • Legacy Contract (8 Line Items) • Going through award process • Next Generation Contract (7 Line Items) • Under Protest • Call-When-Needed Contract • 2 DC-10

  10. Airtanker Program • Next Generation Contract • Plan to award Seven (7) Next Generation Airtankers over the next five (5) years. C-130Q BAe-146 BAe-146 RJ-85 RJ-85 DC-10 MD-87

  11. Airtanker Program • Additional Airtankers • Up to 8 Convair-580s (Canadian and AK contracts) • Up to 8 MAFFS (if requested) • Up to 6 (Oregon Department of Forestry) BAe-146 RJ-85 MD-87

  12. Airtanker Program • Very Large Airtankers (VLATS) • 2 DC-10s on CWN Contract • Can take up to 24 hours to initially mobilize • Moses Lake is the only approved VLAT bases in the PNW. BAe-146 RJ-85 MD-87

  13. Aviation Update • C-27J • U.S. Senate passed National Defense Authorization Act • Wildfire Suppression Aircraft Transfer Act (amendment) will give priority to Forest Service to acquire aircraft • Amendment is at the House of Representatives • Air Force identified an excess of 21 to 38 nearly new C-27J fixed-wing aircraft • Possible Missions: • Smokejumper Platform • Airtanker • Troop/Team Transport C-27J

  14. Aviation Update • Emergency Helicopter Extraction (EHE) • Priority to evaluate and determine path forward • An exclusive use shorthaul-capable helicopter contract will be awarded this year to Mount Rainier Nat. Park with trained crew of SAR Rangers staffing the ship • BLM will only support an extraction program that complies with current DOI policy which is the “Helicopter Short-Haul Handbook-351 DM 1” (Feb. 2010) • Region 5 Law Enforcement and Investigators are approved for Short-Haul • Source List: http://www.fs.fed.us/fire/aviation/av_library

  15. Aviation Update • Aerial Supervision • Forest Service Aerial Supervision Steering Committee • Develop and establish a Forest Service National Aerial Supervision Program which includes : • Air Tactical Group Supervision (ATGS) • Aerial Supervision Modules (ASM) • Lead Plane • Helicopter Coordinator (HELCO) • Working Groups: • Management • Operations • Technology • Training

  16. Aviation Update • Aerial Supervision (contd.) • The Safety Impact Analysis identified 39 hazards and 137 mitigations • Next generation airtankers out-fly current fleet of King Airs, and arrive at fires well ahead of aerial supervision BLM is studying alternatives for faster ASM aircraft • Interagency SME’s are revising refresher training and currency standards for ATGS position • Where will technology take the program in the future?

  17. Aviation Update • Cooperator Aircraft • Continue to work with cooperators on aircraft inspection standards and the flight profiles for which they are dispatched and utilized • Better training/communication is needed for dispatchers on cooperator aircraft policies • FS and DOI approval process is effective and efficient

  18. Aviation Update • Regional Aviation Safety and Management Plan • Bureau of Land Management and Forest Service will have separate plans in 2013 • Kurt Kleiner is updating the OR/WA BLM Aviation plan • Completed and posted on SORO Library • Format will remain as second tier to National plan • RASMP Working Group completed Forest Service Regional plan • Format is second tier to National plan

  19. Aviation Update • Total Flight Hours (Forest Service) • 70,000 • Total Flight Hours (Rotor-Wing) • 41,000 • Total Flight Hours (Light Fixed-Wing) • 25,500 • Total Flight Hours (Airtankers) • 3,500

  20. Aviation Update • Total Flight Hours (Region 6) • 6,160 • Total Flight Hours (Rotor-Wing) • 3,534 • Total Flight Hours (Light Fixed-Wing) • 2,448 • Total Flight Hours (Airtankers) • 178 • 11% of Total Flight Hours

  21. Aviation Update • Total Spent in Aviation (Forest Service) • $370M • Total Spent Rotor-Wing • $270M • Total Spent Light Fixed-Wing • $39M • Total Spent Airtankers • $47M • Total Spent Other • $14M

  22. PNW/AK Aviation What Do We Need to Work On? What Are Your Concerns?

More Related