An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update onPrescriptive Paths for New Small Commercial Buildings RTF January 2007

  2. Goal: A Prescriptive Program For Selected New Small Commercial Construction • Whole-building, integrated measure approach where possible and effective • Deemed or deemed-calculated savings • Commonality across the region • Training for designers, builders & developers

  3. Status • BPA-hosted CNC group reviewed options • Favored approach to piggy-back on work being done by New Buildings Institute • Advanced Building Guidelines (ABv2) • Tailor that work for PNW

  4. Status of NBI Analysis • Three prototype buildings selected • Office: two story building 20,000 sf, four HVAC configurations • Elementary School: 50,000 sf, four HVAC configurations • Retail: One story building, sales & storage areas 15,000 sf, three HVAC configurations • Initial analysis underway • Expect 25,000 DOE2 runs

  5. Status of NBI Analysis • Complex analysis to sort and optimize measures & sequence their application • Expect initial data to review by late January • Will include 3 PNW sites • BPA proceeding with separate NBI contract for PNW-specific analysis & review

  6. Next Steps for RTF • BPA to schedule RTF committee to review initial NBI analysis with NBI lead • Add volunteers to RTF subcommittee • Find DOE2-experienced contractor to help in RTF review

  7. Prescriptive New Building Committee • First wave of volunteers from November • Charlie Grist • Jill Steiner • Ken Eklund • Tim Steele • Seeking additional volunteers