90 likes | 236 Views
Tripartite Discussions Beijing 2005, 31 st Oct – 1 st Nov. Agenda Item 1.1.2 Europe EMSA Study on DH Tanker Safety – IACS follow up on Recommendations. Speaker: S. McIntyre, IACS GPG Chairman. Tripartite Discussions Beijing 2005, 31 st Oct – 1 st Nov. EMSA High Level Panel of Experts
E N D
Tripartite DiscussionsBeijing 2005, 31st Oct – 1st Nov Agenda Item 1.1.2 Europe EMSA Study on DH Tanker Safety –IACS follow up on Recommendations Speaker: S. McIntyre, IACS GPG Chairman
Tripartite DiscussionsBeijing 2005, 31st Oct – 1st Nov EMSA High Level Panel of Experts • BIMCO • CESA • DG TREN • EMSA • IACS • ICS • IMO • INTERTANKO • OCIMF
Kickoff Conclusion 1 Feb2005 31 Mar2005 30 April2004 9 July2004 1 Oct2004 30 Nov2004 Tripartite DiscussionsBeijing 2005, 31st Oct – 1st Nov Terms of Reference • Further improve DH tanker safety • Analyse experience in design, construction, operation, maintenance & survey • Propose solutions for identified areas of concern • Panel Meetings
Tripartite DiscussionsBeijing 2005, 31st Oct – 1st Nov Summary of Recommendations
Tripartite DiscussionsBeijing 2005, 31st Oct – 1st Nov Summary of Recommendation 3 to IACS • Establish a mandatory performance standard for cargo tank coating systems in new vessels • Cargo tank deckhead& tank top structures • IACS to developstandard withIndustry • Present standardto IMO throughGovernment
Tripartite DiscussionsBeijing 2005, 31st Oct – 1st Nov Summary of Recommendation 6 to IACS • Develop surveyor guidance on dealing with significant fatigue failures • Address repairs andreinforcement methods • Develop system toshare fatigue failureinformation • Develop revisions toA.744(18) as needed
Tripartite DiscussionsBeijing 2005, 31st Oct – 1st Nov Summary of Recommendation 7 to IACS • Develop UR on surveys at new construction • Harmonizecontent andstandard ofsurveys • Mandate IACSRec.47 as minimum standard for newconstructionand repairs
Tripartite DiscussionsBeijing 2005, 31st Oct – 1st Nov Summary of Recommendation 8a to IACS • Amend SOLAS to require fixed gas detection & monitoring system for double hull tanks • Applies to new oil and chemicaltankers > 20,000 dwt • IACS to developtechnicalrequirements • Possiblythrough jointindustry workinggroup
Tripartite DiscussionsBeijing 2005, 31st Oct – 1st Nov Status of Recommendations in IACS • Rec.3: Cargo tank coating performance standard- IACS to initiate discussion with IACS/Industry Joint Working Group on Corrosion • Rec.6: Fatigue guidance- Tasked to IACS Survey Panel • Rec.7: New construction survey requirements - IACS UR being considered by IACS Council- IACS SARQS (Rec 47) being updated- IACS CSR to require SARQS or a recognized standard • Rec.8a: Fixed hydrocarbon gas detection - Develop technical requirements subsequent to IMO decision to amend SOLAS