Plan for LTA Refurbishment

Plan for LTA Refurbishment. Borexino Meeting May 14-15, 2014 Andrea Ianni (Princeton Un.). Actual System. LTA-1. LTA-1. Evaporator. Future System. All the cryogenic lines and valves, will be insulated and under vacuum.

tasha
Download Presentation

Plan for LTA Refurbishment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Plan for LTARefurbishment Borexino Meeting May 14-15, 2014 Andrea Ianni (Princeton Un.) An. Ianni - Princeton Un.

  2. Actual System LTA-1 LTA-1 Evaporator An. Ianni - Princeton Un.

  3. Future System • All the cryogenic lines and valves, will be insulated and under vacuum Only one LTA (when under regeneration, we will switch temporary to the LAKN) An. Ianni - Princeton Un.

  4. 1/3 of the work will be paid by LNGS The work and Schedule • Total cost: 36 KEuro • Heidelberg in charge to buy a new filter cartridge (done) and new resistors for the Evaporator (not yet) 2/3 of the work will be paid by Heidelberg An. Ianni - Princeton Un.

  5. The work and Schedule The work consists of: Dismounting the LTA-2 column and electrical panel (LNGS Operations Group and Heidelberg personnel); Installation of new manifold and connection with the Linde tank (Criotec); Repairing of the Evaporator (Criotec); Installation of the new filter cartridge and refurbishment of the electrical cabinet and signals (LNGS + Heidelberg) for the LTA-1 Commissioning of the new System (LNGS) Possible Date to start the work: July 2014 An. Ianni - Princeton Un.