SUBSEA PRODUCTION SYSTEMS (SC17). UPDATE SUMMER 2014. SC 17 Report Summer 2014. High activity level on documents 16 of 27 documents being worked on 6 new TR Appointed l iaisons with Materials group, International Standards, Industry Standardization
E N D
SUBSEA PRODUCTION SYSTEMS(SC17) UPDATE SUMMER 2014
SC 17 Report Summer 2014 • High activity level on documents • 16 of 27 documents being worked on • 6 new TR • Appointed liaisons with Materials group, International Standards, Industry Standardization • 17A RP -Design &Operation of Subsea Production Systems- General requirements and Recommendations • Will remove annex A and annex I. Material will go into TR • Annex G is covered in 17P; will delete • 17E -Subsea Umbilicals • Will add Medium Voltage Cable (MV). Currently only includes Low Voltage (LV) • 17F – Subsea Production Control Systems • Will remove chemical injection systems out of the document and turn it into new document TR/RP to be defined • 17N –Subsea Reliability • Removing references to 17Q (Subsea Quality) • After completion, will address is 17Q is maintained or removed • 17S –Subsea Multiphase Flow Meters • Under development • Will submit as Standard instead of RP • 17W –Subsea Capping Stacks • Passed ballot. API currently editing for publishing
SC 17 Report Summer 2014 • Chemical Injection Systems • Sub comeette has 6 months to define scope adresing Operations, Systems, and Hardware • Once defined will create SRRR • will work under TR13 till • Composite Thermoplastic Pipe • Motion passed for RP • Concern of limited suppliers (currently 2) • Currently referenced under 17G1