1 / 3

SUBSEA PRODUCTION SYSTEMS (SC17)

SUBSEA PRODUCTION SYSTEMS (SC17). UPDATE SUMMER 2014. SC 17 Report Summer 2014. High activity level on documents 16 of 27 documents being worked on 6 new TR Appointed l iaisons with Materials group, International Standards, Industry Standardization

Download Presentation

SUBSEA PRODUCTION SYSTEMS (SC17)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SUBSEA PRODUCTION SYSTEMS(SC17) UPDATE SUMMER 2014

  2. SC 17 Report Summer 2014 • High activity level on documents • 16 of 27 documents being worked on • 6 new TR • Appointed liaisons with Materials group, International Standards, Industry Standardization • 17A RP -Design &Operation of Subsea Production Systems- General requirements and Recommendations • Will remove annex A and annex I. Material will go into TR • Annex G is covered in 17P; will delete • 17E -Subsea Umbilicals • Will add Medium Voltage Cable (MV). Currently only includes Low Voltage (LV) • 17F – Subsea Production Control Systems • Will remove chemical injection systems out of the document and turn it into new document TR/RP to be defined • 17N –Subsea Reliability • Removing references to 17Q (Subsea Quality) • After completion, will address is 17Q is maintained or removed • 17S –Subsea Multiphase Flow Meters • Under development • Will submit as Standard instead of RP • 17W –Subsea Capping Stacks • Passed ballot. API currently editing for publishing

  3. SC 17 Report Summer 2014 • Chemical Injection Systems • Sub comeette has 6 months to define scope adresing Operations, Systems, and Hardware • Once defined will create SRRR • will work under TR13 till • Composite Thermoplastic Pipe • Motion passed for RP • Concern of limited suppliers (currently 2) • Currently referenced under 17G1

More Related