Web-based Technology Web-based Project Management Application (WPMA) for Dredging Projects By

Web-based Technology Web-based Project Management Application (WPMA) for Dredging Projects By GUSTAVO VECINO Civil Engineer February 2013. PRESENTATION OUTLINE An overall description of dredging projects The analysis of specific dredging project management issues

tass
Download Presentation

Web-based Technology Web-based Project Management Application (WPMA) for Dredging Projects By

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Web-based Technology Web-based Project Management Application (WPMA) for Dredging Projects By GUSTAVO VECINO Civil Engineer February 2013

  2. PRESENTATION OUTLINE An overall description of dredging projects The analysis of specific dredging project management issues Project management problems encountered during analysis Proposed solutions to the problems Development of WPMA A scenario for future project implementation Conclusion Questions

  3. OVERALL DESCRIPTION OF DREDGING PROJECTS Channels, civil, and Maritime Infrastructure Past and Present Herbich (2000) and World Dredging (March 2005)

  4. 1. OVERALL DESCRIPTION OF DREDGING PROJECTS Navigational Channels

  5. 1. OVERALL DESCRIPTION OF DREDGING PROJECTS Land Protection, Beach Nourishment (Terra et Aqua, June 2006)

  6. 1. OVERALL DESCRIPTION OF DREDGING PROJECTS New Ports (Terra et Aqua, September 2006)

  7. 1. OVERALL DESCRIPTION OF DREDGING PROJECTS Civil Engineering Projects

  8. 1. OVERALL DESCRIPTION OF DREDGING PROJECTS Cutter Head Dredge (IHC, October 2005)

  9. 1. OVERALL DESCRIPTION OF DREDGING PROJECTS Hooper Dredge (DPC, October 2006)

  10. 1. OVERALL DESCRIPTION OF DREDGING PROJECTS Mechanical Dredges (GLDD, October 2005)

  11. 2. THE ANALYSIS OF SPECIFIC DREDGING PROJECT MANAGEMENT ISSUES To perform this analysis, I examined general dredging project management functions and processes.

  12. 2. THE ANALYSIS OF SPECIFIC DREDGING PROJECT MANAGEMENT ISSUES

  13. 2.THE ANALYSIS OF SPECIFIC DREDGING PROJECT MANAGEMENT ISSUES

  14. 2.THE ANALYSIS OF SPECIFIC DREDGING PROJECT MANAGEMENT ISSUES

  15. 3. PROJECT MANAGEMENT PROBLEMS The major management problems encountered were: The lack of information-sharing between owner and potential contractors during the preconstruction phase. The lack of information flow to owners during the construction phase of the project.

  16. 4. PROPOSED SOLUTIONS Pre-qualifying potential contractors in the early stages of the project’s preconstruction phase. Bringing an independent management team with expertise in dredging into the project in its early stages. Developing a comprehensive information and communication management plan, risk management plan. Using information and communication technologies to implement the three points described above.

  17. 5. DEVELOPMENT OF THE WPMA SYSTEM The processes followed during the development of the WPMA were: Planning and Analysis of the WPMA Design and Implementation of the WPMA Planning Design

  18. Planning Design 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA Objective System Requirements System Development Plan

  19. Planning Design 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA Objective:

  20. Planning Design 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA Requirement Specifications: R1. The WPMA shall be a web-based application running on a server that has access to the Internet. R2. The WPMA shall be accessed through a web browser for data and documentation input and for data, information, and documentation output. R3. The WPMA shall implement data input, data output, reporting capabilities, and data management capabilities in accordance with the following roles: Owner, Contractor, Owner’s Team, and Contractor’s team.

  21. Planning Design 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA Requirement Specifications: R4. The WPMA shall have the capability to authenticate the users in accordance with their corresponding roles for data and information management. This will enable the logging and certification of users at any geographic location that have an Internet connection. R5. The WPMA shall store the information entering the system on a database for future processing. R6. The WPMA shall have automatic data processing capability. The data entering the system will be automatically processed for reporting capabilities.

  22. Planning Design 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA The Development Plan: WPMA Development Methodology Definition WPMA Architecture Definition

  23. Planning Design 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA The Development Plan - WPMA Development Methodology Definition:

  24. Planning Design 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA The Development Plan - WPMA Architecture Definition: During the WPMA System Architecture Definition, several system alternatives were explored: Stand-alone client application running on a client computer and a database (i.e. Access). Client application with a central server and a database server. Web-based application with a managed server and a database server.

  25. Planning Design 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA The Development Plan - WPMA Architecture Definition:

  26. Planning Design 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA The Development Plan - WPMA Architecture Definition: The WPMA has been implemented using the following tools: Visual Studio 2005 development environment. ASP.NET 2.0 framework. C# programming language. SQL Server 2005 database. MS Reporting Services 2005 for report services. MS SharePoint 2007 for collaborative environments. MS Small Business Server 2007 Internet Information Services 6.0

  27. Planning Design 5. DEVELOPMENT OF THE WPMA SYSTEM 5.2 Design and Implementation of the WPMA Data Input and Output Data Storing Data Processing Reporting the Information

  28. Planning Design

  29. MD Basics Planning Design

  30. Transporting Loaded Barges to Unloading Site Planning Design

  31. Unloader Boom and Snorkel Pump Planning Design

  32. Unloading Operation Planning Design

  33. Placement Site Planning Design

  34. 5. DEVELOPMENT OF THE WPMA SYSTEM

  35. Planning Design 5. DEVELOPMENT OF THE WPMA SYSTEM

  36. Planning Design

  37. Planning Design

  38. Planning Design

  39. Planning Design

  40. Planning Design

  41. Planning Design

  42. 6. A SCENARIO FOR FUTURE PROJECT IMPLEMENTATION WPMA Development Panama Canal Educating the Industry WPMA Commercialization

  43. Conclusions The WPMA Concept The WPMA Functions The Development Methodology The future of the WPMA

  44. Questions ?