Pixel Production Database STATUS P. Netchaeva - INFN Genova 13 February 2003

Pixel Production Database STATUS P. Netchaeva - INFN Genova 13 February 2003. Sensors. PDB readiness : Item tables + java application for Wafer upload (with sub-structures) + Report with links to Items exist. Test tables (-last update)

Download Presentation

Pixel Production Database STATUS P. Netchaeva - INFN Genova 13 February 2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pixel Production Database STATUSP. Netchaeva - INFN Genova13 February 2003

  2. Sensors PDB readiness: Item tables + java application for Wafer upload (with sub-structures) + Report with links to Items exist. Test tables (-last update) + java applications for upload data and download data file + Reports exist. Missing: Last update of test tables. Data: 236 wafers: 201 CiS and 35 Tesla are registered. 121 wafers are with Visual inspection test results. 44 wafers are with Planarity test results. 24 wafers are with SCR test results. 0 wafers are with Thickness test results. Tiles: 478 IV tested (of 708) 36 ITS tested

  3. Electronics PDB readiness: Item tables + java application for Wafer upload (with sub-structures) + Report with links to Items exist. FE and MCC “colours” + java applications for their upload + Reports for colour representation of these Items exist. Missing: New reticle layout will not change Item table, but will change java application for Wafer upload. Test definitions, as a consequence: Tables + java applications + Reports for tests. Data: 34 wafers with FEs and MCCs.

  4. Bare Modules • PDB readiness: • Item tables • + java application for Tile + 16 FE assembling • + Report with links: • to Items, • to Bare Module Assembly sub-Items with link to future tests, • to X-ray test data • exist. • Missing: • Test definitions, as a consequence: • Tables + java applications + Reports for tests. • Data: • 33 Bare Modules.

  5. Flex Objects PDB readiness: Item tables + java applications for Flex+components, Flex+MCC assembling + Report with links to Items exist. Test tables + java application for upload + Reports exist. Missing: Our Flex Items all are called “Prototypes”. The PDB Item structure for production Items does not exist. Data: 166 FlexLoadedPrototype Items 46 FlexMCCPrototype Items. Missing: Test data.

  6. Flex Objects: Modules • PDB readiness: • The Modules are Flex Object Items, so as for Flex Objects: • Item tables • + java applications for Flex with MCC + Bare Module assembling • + Report with links • to Items • to Module Assembly sub-Items with link to future tests • exist. • Test IV + Report exist. • Missing: • Our Module Item is called “ModuleFEIPrototype”. • The PDB structure for production Item “Module” does not exist. • Test definitions, as a consequence: • Tables + java applications + Reports for tests. • Data: • 23 ModuleFEIPrototype Items with substructures.

  7. 23 ModuleFEIPrototype Items:

  8. not registered… Mechanics + Assemblies with Modules PDB readiness: Structures are defined. => the Items and Assemblies can be registered at least manually. Local Support test tables + java applications + Reports exist. Missing: java application to register Assemblies in the easy way. To start to think about: Tests for Staves (Bi-staves) and Sectors with Modules on them. Data: 200 Omegas are registered. 11 TMT-left are registered with CC test results. Missing (of existing Items): Al tubes, TMT-right, Sector parts. First Module is mounted on Sector: We need to accelerate…

  9. Shipments • PDB readiness: • java applications for: • send and receive Wafer (sensor or electronics) • send just received Items without change • receive an Assembly with the following update • of all components location • + Report with links to Shipments • exist. • Shipment statistics Report • (Items shipped/time) exist. • The activity of the manufacturers • seems to be well covered • by persons in charge. • Missing: • Send Electronics Wafer with • new reticle layout. Data