ALICE QUARTERLY REPORT 2009Q1

ALICE QUARTERLY REPORT 2009Q1. Summary. Data Taking Regular cosmic data taking will resume in June 2009 MC Data Production On demand productions in preparation of 2009/2010 data taking Analysis CAF (fast), analysis train (organized) and end user analysis (chaotic) operational

Download Presentation

ALICE QUARTERLY REPORT 2009Q1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ALICE QUARTERLY REPORT2009Q1 ALICE 1Q2009 report

  2. Summary • Data Taking • Regular cosmic data taking will resume in June 2009 • MC Data Production • On demand productions in preparation of 2009/2010 data taking • Analysis • CAF (fast), analysis train (organized) and end user analysis (chaotic) operational • Software: AliRoot • Add detectors software ready • Bug fixing • Services • …. • Milestones ALICE 1Q2009 report

  3. Data taking/processing • Because of planned intervention on the experiment (cabling modification, installation of additional detectors), data taking stopped in October 2008 • Data taking (cosmic) with subset of detectors is starting • Data taking (cosmic) with complete detector will resume in June 2009 • Full data processing (cosmic) chain will be reactivated in June 2009 • On line calibration and QA • Collection of calibration data in OCDB • On demand replication to T1’s • Data reconstruction at T0, on demand re-reconstruction at T1s • Data analysis on Grid, CAF & GSIAF (possibly LAF) ALICE 1Q2009 report

  4. Data transfers • Periodic tests of FTS/FTD from Tier0 to Tier1s ALICE 1Q2009 report

  5. MC Data • Productions in progress (prioritized according to LHC schedule) • Small first physics productions • pp minimum bias (large 100 Mio events) • pp various signals (20 different cycles) • AA (lowest priority, also for embedding) • End user analysis • Ever increasing number of users, presently some 120 regular ALICE 1Q2009 report

  6. Software: AliRoot • Software for all detectors ready • geometry, particle transport, raw data format, calibration, QA, reconstruction • New improved TPC tracking (HLT) and TRD reconstruction • Pileup simulation and vertex reconstruction implemented • Improvements and new implementation of trigger simulation • Weekly reviews on new MC productions ALICE 1Q2009 report

  7. Analysis Facility • CAF • Regular ROOT/AliRoot and core PROOF updates • In production, high availability and demand service, all new MC productions validated on CAF • GSIAF – same as above • Analysis software • Framework has been finalized (only minor fixes) • Physics Working group continuously develop/consolidate analysis algorithms • Analysis train is now part of the Grid processing • Lyon Analysis Facility – PROOF-enabled (LAF) in preparation ALICE 1Q2009 report

  8. Services • Stable version of AliEn in operation • Job submission through WMS • Submission code updates and WMS patches are increasing the service stability • New WMS gLite 3.2 instances added (4 at CERN, LAL, IPN0) • CREAM CE deployment is ongoing • most recent CERN, Legnaro, IHEP, Nantes • likely will meet the deadline (end June) for parallel deployment on all sites • SLC5 is not in the plan, but highly desirable • Participation in STEP09 is being planned • Deployment of storage continues, individual site validation model is working very well ALICE 1Q2009 report

  9. ALICE activities calendar STEP’09 Cosmics data taking WMS and CREAM CE Reprocessing Pass 2 Analysis train Replication of RAW Data taking RAW deletion 12 01 02 03 04 05 06 07 08 09 10 11 12 2008 2009

  10. Hardware • Large CASTOR2 disk pool for RAW data registration • work has started between IT/DM, IT/FIO and ALICE on setting up and testing of a CASTOR2 instance with xrootd access for RAW data- the size of the pool will be O(1.5PB) • uses CASTOR v.2.1.8 with latest xrootd development • current progress: a test poolto tune: • writing from DAQ P2 buffer (via xrtootd), • Grid jobs reconstruction and • copy from disk to tape • later to add T0->T1 transfers via FTD/FTS ALICE 1Q2009 report

  11. Milestones • New milestones • No pending milestones • MS-129 Mar 09: Analysis train operational • Done, adding and testing new wagons as they become available • MS-130 Jun 09: CREAM CE deployed at all sites • MS-131 26 Jun 09: AliRoot release ready for data taking ALICE 1Q2009 report