1 / 19

ME 322: Instrumentation Lecture 2

ME 322: Instrumentation Lecture 2. January 24, 2014 Professor Miles Greiner. Reminders. HW 1 due Monday Use ME 322 ID number (from WebCampus ) not name We have moved some students to Lab Section 5 (W 1-3:45 PM). Please check MyNevada to know your current Lab assignment.

tatum
Download Presentation

ME 322: Instrumentation Lecture 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ME 322: InstrumentationLecture 2 January 24, 2014 Professor Miles Greiner

  2. Reminders • HW 1 due Monday • Use ME 322 ID number (from WebCampus) • not name • We have moved some students to Lab Section 5 (W 1-3:45 PM). Please check MyNevada to know your current Lab assignment.

  3. Results of the Quad Measurements • Data is on Lab 2 website • Today I’ll show you how to process that data, which you will need to repeat and present in Lab 2, Analysis of Quad Measurement • Spreadsheet had Measured Data and Calculations • H, DC , NCi, NCA, F = DC/NCA • NSi, NSA, S=F*NSA • NLi, NLA, L=F*NLA • A = LS • C = A*($3.49/200 ft2) • How to Plot • F versus H; L vs S (scatter plots) • Cost Estimate Histogram • Questions • Is stride length F highly correlated with height, H? • What is the sample mean and standard deviation of the cost estimates? • Are the measured values of L and S correlated? • If you budget the amount of your cost estimate, you are only 50% sure to have enough to cover quad (be above the average value, which we assume is the most accurate estimate) • How much money should you budget to be 90% sure to have enough

  4. Randomly Varying Processes • The output of a measurement instrument is affected by the measurand (the quantity being measured) and many uncontrolled (undesired) factors • Consider a process (such as a measurement) that has a very large number of factors that can, independently, increase or decrease the value of the outcome • Its not likely that all or a large majority of the factors will push the outcome in the same direction. • Its more likely that “most” of the factors will cancel each other, and push the outcome only “slightly” in one direction or the other. • This describes how uncontrolled factors affect the output of measurement systems (instruments)

  5. Gaussian (Normal) Probability Distribution Function • Describes Randomly Varying Processes • Looks like the pattern observed from the cost estimate histogram in Labs 1 and 2 • We were able to estimate m ~ and s ~ for that data

  6. How can we use this? • If a sample is very large, and if the process variations are “normally” distributed, • Then expect sample histogram to take a bell shape, • And, if we know s and m, the probability that the next measurement x will be in the range x1 < x < x2 is • Note, for any s and m :

  7. Non-Dimensionalization • Define • Number of standard deviations x is above the mean • We can show that the probability that the next measurement is between z1 and z2 is: • Where • This integral is tabulated on page 146, for z > 0

  8. Graphical RepresentationArea from center (z = 0) to z For z > 0 : Note:

  9. Negative values of z For z1 < 0 :

  10. Symmetric Example Find the Probability a measurement is within one standard deviation (s) of the mean (m). = = -1 = = 1

  11. Page 146

  12. Next measurement is within 2s and 3s of the mean

  13. One-sided example • From Lab 2, what seed cost will cover (be greater than) 90% of all future estimates? • One-sided example • P=0.9= I(z2)-I(z1) • z2 = ? But z1-∞, so I(-∞)= -I(∞)=-0.5 • So P = 0.9 = I(z2) – [-0.5] • 0.4 = I(z2) • Interpolate between z2 = 1.28 and 1.29 • Get z2 = 1.282

  14. Lab 2 • If you make a measurement, there is a 50% likelihood it is below the mean (best) value. • How much should you add to your best estimate to be 90% you are above the mean? • Answer: 1.282 standard deviations

  15. Extra Slides

  16. Area of UNR Quad • Find Short Side (S) • NSi • NSA • Find Long Side (L) • NLi • NLA

More Related