ALICE DAQ Progress Report Comprehensive Review IV P. Vande Vyvre – CERN/PH. ALICE DAQ. Institutes, Responsibilities, Milestones DAQ Architecture DDL and D-RORC MOOD (Data quality monitoring) DAQ Fabric Data Challenge V Installation, test and commissioning. ALICE DAQ.
E N D
ALICE DAQProgress Report Comprehensive Review IVP. Vande Vyvre – CERN/PH
ALICE DAQ Institutes, Responsibilities, Milestones DAQ Architecture DDL and D-RORC MOOD (Data quality monitoring) DAQ Fabric Data Challenge V Installation, test and commissioning
ALICE DAQ Institutes, Responsibilities, Milestones DAQ Architecture DDL and D-RORC MOOD (Data quality monitoring) DAQ Fabric Data Challenge V Installation, test and commissioning
Institutes & Responsibilities • Birmingham • TRG/DAQ simulation • RORC receiver cards • KFKI-Budapest : • DDL: optical links and RORC receiver cards • Radiation tolerance tests (with Technical University/Budapest and Institute of Nuclear Research (ATOMKI/Debrecen) • CERN: • DATE: DAQ software framework • DAQ fabric • Zagreb: • TRG/DAQ simulation • AFFAIR: performance monitoring package • Split: • TRG/DAQ simulation • Storage • Collaborating institutes: Istanbul (Data quality monitoring)
Milestones and outcome of CR3 LHCC Milestones • Detector readout with January 2003 • TDR preparation status March 2003 • Common TDR submission to LHCC December 2003 • DDL pre-production for detector 1Q 2004test and commissioning • D-RORC pre-production for detector 1Q 2004 test and commissioning • DAQ reference system in DAQ lab: 4Q 2004 • DAQ systems for surface tests and commissioning: • SXL2: mounting hall on the surface of point 2 1Q 2005 • Si. lab: ITS surface test 2005 • Milestones Final DAQ • Jan 2006 Final DAQ system ready with all functionalities 20 % of final performance • Nov 2006 30 % for pp and first HI run • Oct 2008 100 % for second HI run (needs and budget)
ALICE DAQ Institutes, Responsibilities, Milestones DAQ Architecture DDL and D-RORC MOOD (Data quality monitoring) DAQ Fabric Data Challenge V Installation, test and commissioning
Physics requirements Detector • Pb-Pb beam • Rate Max. ev. size • Central 20 Hz 86.0 MB • MB 20 Hz 20.0 MB • Dimuon 1600 Hz 0.5 MB • Dielectron 200 Hz 9.0 MB • pp beam • MB 100 Hz 2.5 MB Front-end Buffer Trigger Level 0,1 Readout Buffer Trigger Level 2 Detector Data Link(DDL) 25 GB/s 2.50 GB/s 1.25 GB/s High-Level Trigger Local DataConcentrators (LDC) Running modes A: DAQ B: DAQ+HLT Analysis C: DAQ+HLT Trigger Event-Building Network Global Data Collectors(GDC) Storage network Permanent Data Storage (PDS)
DAQ architecture PDS TDS TDS Rare/All CTP L0, L1a, L2 BUSY BUSY LTU LTU DDL H-RORC L0, L1a, L2 HLT Farm TTC TTC FEP FEP FERO FERO FERO FERO Event Fragment Sub-event Event File 10 DDLs 10 D-RORC 10 HLT LDC 123 DDLs 262 DDLs 329 D-RORC 175 Detector LDC LDC LDC LDC LDC LDC Load Bal. Event Building Network EDM 50 GDC 25 TDS GDC GDC GDC DSS DSS GDC 5 DSS Storage Network
Key building blocks and concepts • Protocol-less push-down strategy • System throttling by X-on/X-Off signals • Detector interface via a standard link (DDL) • Readout • Control and download • Software framework (DATE) • Dataflow (data driven according to TRG generated event tags) • Control (FSM and messages) • Monitoring • Distributed DAQ Fabric • LDC • GDC • DSS
ALICE DAQ Institutes, Responsibilities, Milestones DAQ Architecture DDL and D-RORC MOOD (Data quality monitoring) DAQ Fabric Data Challenge V Installation, test and commissioning
D-RORC Hardware Architecture Configuring JTAG JTAG CMC I/F Conf.Flash P11 P12 MediaI/F 1 250 MB/s APEXFPGA Optical I/F MediaI/F 2 250 MB/s P13 P14 BusyI/F LVDS I/F 528 MB/s 64-bit/66 MHz, PCI/PCI-X
D-RORC Hardware • D-RORC with plug-in DIU • Read out single DDL channel • Detector integration • D-RORC with integrated DIU ports • 2 DDL channels • Integration with the HLT system
D-RORC and DIU • Testing the integration of the D-RORC and the DIU using the new library (v4.2) • rorc_receive –g 3 ... (internal loopback) • rorc_receive –g 1 ... (DIU loopback) PC + single-channel D-RORC CPU: 2 x Xeon 2400 MHzKernel: 2.4.20-30.7
D-RORC and DATE • 2 D-RORC cards • Same PCI bus • Data generation: • Front-end emulator cards • Internal data generator
D-RORC and DATE 1 week 220 106 events 98 MBytes/s
Data splitter for DAQ/HLT interface FEE Emulator PC + twin-channel D-RORC CPU: Intel P3 800 MHzKernel: 2.4.20-24.7rorc_receive DAQ Detector PC + single-channel D-RORC HLT CPU: 2 x Xeon 2400 MHzKernel: 2.4.20-30.7rorc_receive
ALICE DAQ Institutes, Responsibilities, Milestones DAQ Architecture DDL and D-RORC MOOD (Data quality monitoring) DAQ Fabric Data Challenge V Installation, test and commissioning
MOOD • Monitoring Of Online Data • Detector Debugger (raw data visualizer) • Written in C/C++ • Based on ROOT • Based on DATE • Data quality monitoring framework for all ALICE detectors
MOOD: Current Detector Scheme • Detectors currently implemented : • ITS – SDD • TPC Sector • HMPID Photocathode • Detectors to be implemented : • All detectors individually • Test setups • ALICE as a whole
TPC Sector Test Tool Bar Pad Plane 3D View Charge Plane Charge Plane 3D Event Size Distribution
HMPID Photocathode (1) • Tabs • Photocathode • 3D View • Size Distribution • Event Dump • Logs • …
HMPID Photocathode (2) • Tabs • Photocathode • 3D View • Size Distribution • Event Dump • Logs • …
ITS - SDD (1) • Tabs • SDD Display • 3D View • Size Distribution • Event Dump • Logs • …
ITS - SDD (2) • Tabs • SDD Display • 3D View • Size Distribution • Event Dump • Logs • …
ALICE DAQ Institutes, Responsibilities, Milestones DAQ Architecture DDL and D-RORC MOOD (Data quality monitoring) DAQ Fabric Data Challenge V Installation, test and commissioning
DAQ Reference System 1 KVM switch 4 LDCs (Local Data Concentrator): - rackmount PCs- U1, U2, U4 height- equipped with 6 D-RORCs 6 DDLs 2 GDCs (Gobal Data Collector): - rackmount PCs- U1 height - equipped with FC cards 1 FC switch 2 TDS (Transient Data Storage): - rackmount disk array- U2 height- IDE and FC disks standard LAN 1 GE switch 1 DSS (DAQ Services): - rackmount PC- U4 height- hot-swap SCSI disks
Reference Setup – Front • DAQ lab • Detect and address integration issues • System for development and support L3 rack 2x LDCs: - 4U height- dual Xeon- 2x D-RORC cards DDL 2x GB Ethernet switch: 3COM SuperStack 3 KVM switch: Raritan Paragon UMT2161 2x GDCs: - 1U height- dual Xeon- Qlogic QLA2310F cards Fibre Channel switch: Broacade SilkWorm 3800 2x disk arrays: - Infortrend IFT-6330 - DotHill SANnet II DSS: - 4U height- quad Xeon- 3x 36GB SCSI disks
Reference Setup - Rear Cat5 cables: - Ethernet- KVM- RJ45 connectors Mounting rails (!) Power distributor Optical cables: - DDL- FiberChannel- 2 Gbit/s multimode - LC-LC connectors L3 rack
ALICE DAQ Institutes, Responsibilities, Milestones DAQ Architecture DDL and D-RORC MOOD (Data quality monitoring) DAQ Fabric Data Challenge V Installation, test and commissioning
ADC V Hw Architecture 10 Tape Server 4 x GE 32 IA64 HP-rx2600 Servers 2 x 1 GHz Itanium-2 2 GB RAM Broadcom NetXtrem BCM5701 (tg3) RedHat Advanced Workstation 2.1 6.4 GB/s to memory, 4.0 GB/s to I/O 3COM 4900 10GE 4 x GE 10GE 32 x GE 10GE 4 x GE 3COM 4900 16 x Gbit Enterasys E1 OAS 12 Gbit, 1 x 10 Gbit Enterasys ER16 16 slots 4/8 x Gbit or 1 x 10 Gbit/slot 4 x 7 Disk servers 2 x 2.0 GHz Xeon 1 GB RAM Intel 82544GC 3COM 4900 ~ 80 CPU servers 2 x 2.4 GHz Xeon, 1 GB RAM, Intel 8254EM Gigabit in PCI-X 133 (Intel PRO/1000), CERN Linux 7.3.3
Achievements (1) • System size (lack of resources in LCG testbed) • System scalability • Performance test with ALICE data traffic • ALICE-like traffic • ALICE-like events simulated data used:Realistic (sub-)event size on tape (ALICE year 1) • DATE load-balancing demonstrated and used • Sustained bw to tape not achieved • Peak 350 MB/s. Sustained 280 MB/s over 1 day • Reached production-quality level only last week of test • IA-64 from Openlab successfully integrated in the ADC V • Simulated raw data used for performance test • Data read back from CASTOR and verified
Achievements (2) • Network • LDCs and GDCs: stable and scaleable including trunking • Between GDCs and disk servers: • Unreliable • Truncking not scaling as expected • Module broken and replaced twice in Enterasys • 10 Gbit Eth. Backbone • New generation of NIC cards (Intel Pro 1000) • NIC from Broadcom unreliable. Replaced by Intel Pro 1000. • Storage • Hardware problem on the disk servers • Several last minute workarounds needed (scripts for monitoring and reconfiguring)
Performance Goals (1) 650 MB/s
Performance Goals (2) MB/s to Mass Storage 300 MB/s
Open issues and future goals • CASTOR: • Recovery from malfunctioning disk server • New stager • Special daemon between CPU and disk server instead of standard RFIO daemon. Needed to achieve adequate performance. Should be put back in main development. • DAQ • Increase performances • Network • First prototypes of 10 Gbit Eth. equipment from Enterasys unreliable • Enterasys support not effective on this case • Meeting scheduled with LCG PEB to present results and address the open issues
ALICE DAQ Institutes, Responsibilities, Milestones DAQ Architecture DDL and D-RORC MOOD (Data quality monitoring) DAQ Fabric Data Challenge V Installation, test and commissioning
DAQ Commissioning (1) • What: • DAQ itself • How the DAQ will help the commissioning of other systems • Where: • ACR: ALICE Control Room. • PX24-CR1: ALICE DAQ Counting Room located in the access shaft. • SXL2: mounting hall on the surface of point 2. • UX25: experimental underground area • When: • 1 Q 2005: all DAQ functionalities. Hw at the final location. 20 DDLs for readout of 2 TPC sectors in SXL2 + other detectors • Jan 2006 Final DAQ system ready with all functionalities 20 % of performance • Nov 2006 30 % of performance • Oct 2008 100 % of performance (needs and budget)
DAQ Commissioning (2) • Tests at the construction site of hardware elements • Verification of the DDLs and D-RORCs • Test of the cards with a test station made of a PC and DDL test software • Tests at the development sites of software elements: • AFFAIR, DATE, DDL sw, CASTOR • Combined tests well before installation: test beams, Data Challenges • Standalone tests in experimental area • DAQ: possibility of injecting data at every stage of the data flow. • Each segment of the dataflow first tested in isolation and then in combination with other elements • DAQ integration at Point 2: • Integration with ECS • Tests with TRG, HLT, DCS • Detector test and commissioning • Test with cosmic and pulser trigger • From June 2005: a TTC-based trigger to trigger autonomous DDL data sources for global tests of the DAQ involving DDLs. • From January 2006: a cosmic or pulser trigger for the commissioning of detectors involving Trigger and DAQ
DAQ Tools for Detector Commissioning DDL Simulator • Lab test • DDL Simulator: standalone daughter-card • Detector readout with DDL and DATE • Beam test • Detector readout by DDL and DATE • VME for trigger and older electronics (Silicon telescope e.g.) • Point 2 • DAQ system at Point 2 in 2004 • Detector test and commissioning • System will evolve in size and performances according to the needs. • Concurrent tests of several detectors (~3 in 2004, all in 2006) • Complete capabilities since the start • Control from ACR or any computer • Other tests • ITS integrated test Detector Readout card under test
DAQ Tools for Detector Commissioning Input Data from Pattern Generator • Lab test • DDL Simulator: standalone daughter-card • Detector readout with DDL and DATE • Beam test • Detector readout by DDL and DATE • VME for trigger and older electronics (Silicon telescope e.g.) • Point 2 • DAQ system at Point 2 in 2004 • Detector test and commissioning • System will evolve in size and performances according to the needs. • Concurrent tests of several detectors (~3 in 2004, all in 2006) • Complete capabilities since the start • Control from ACR or any computer • Other tests • ITS integrated test Optical Fiber to LDC SIU (DDL)
DAQ/TOF integration 4.5 days 59 106 events 86 MBytes/s.
DAQ Tools for Detector Commissioning Trigger Logic Detector readout DDL SIU Silicon tel. readout DDL LDC (PC/Linux) DDL DIU LDC (VME/Linux) RORC DATE V4 Event Building Network Data Storage in Computing Center GDC • Lab test • DDL Simulator: standalone daughter-card • Detector readout with DDL and DATE • Beam test • Detector readout by DDL and DATE • VME for trigger and older electronics (Silicon telescope e.g.) • Point 2 • DAQ system at Point 2 in 2004 • Detector test and commissioning • System will evolve in size and performances according to the needs. • Concurrent tests of several detectors (~3 in 2004, all in 2006) • Complete capabilities since the start • Control from ACR or any computer • Other tests • ITS integrated test
DAQ Tools for Detector Commissioning • Lab test • DDL Simulator: standalone daughter-card • Detector readout with DDL and DATE • Beam test • Detector readout by DDL and DATE • VME for trigger and older electronics (Silicon telescope e.g.) • Point 2 • DAQ system at Point 2 in 2004 • Complete capabilities since the start • Detector test and commissioning • System will evolve in size and performances according to the needs • Concurrent tests of several detectors (~3 in 2004, all in 2006) • Control from ACR or any computer • Other tests • ITS integrated test
DAQ Tools for Detector Commissioning • Lab test • DDL Simulator: standalone daughter-card • Detector readout with DDL and DATE • Beam test • Detector readout by DDL and DATE • VME for trigger and older electronics (Silicon telescope e.g.) • Point 2 • DAQ system at Point 2 in 2004 • Complete capabilities since the start • Detector test and commissioning • System will evolve in size and performances according to the needs • Concurrent tests of several detectors (~3 in 2004, all in 2006) • Control from ACR or any computer • Other tests • ITS integrated test
DAQ for Test & Commissioning SR Hall SX Hall SXL Hall (ALICE sub-detector assembly) (Networking) WR1 WR2 ACR DDL PX24/CR1 (DAQ) LAN LAN PX24/CR2 (HLT) DDL Patch Panel Access Shaft PX24/CR3 (DCS) PX24/CR4 (Misc.) 1 Q 2005 : DAQ System at Point 2 12 DDLs for TPC 8 DDLs for others 3 partitions 2005: similar system in Si. lab. UX25 (Experimental Area)
Final DAQ System SR Hall SX Hall SXL Hall (ALICE sub-detector assembly) (Networking) WR1 WR2 ACR PX24/CR1 (DAQ) LAN DDL PX24/CR2 (HLT) DDL Patch Panel Access Shaft PX24/CR3 (DCS) PX24/CR4 (Misc.) UX25 (Experimental Area) Installation staging: (% of final DAQ performance) 2006: 20% 2007: 30% 2008: 100%