100 likes | 193 Views
Flooring Improvement Project. GBA 573 IT Project Management. Problem Statement. The problem is the continuous maintenance of a lightly colored carpet installed in multiple high traffic areas in the house along with the decline in carpet appearance. . Deliverables. End Product
E N D
Flooring Improvement Project GBA 573 IT Project Management
Problem Statement • The problem is the continuous maintenance of a lightly colored carpet installed in multiple high traffic areas in the house along with the decline in carpet appearance.
Deliverables • End Product • A durable, aesthetically pleasing, ceramic tile floor as a replacement to the current carpet covering.
Project Team • Project Manager • Installation Supervisor • Installation Assistant 1 • Installation Assistant 2
Project Scope • Remove existing carpeting • Install new ceramic tile in the: • Living Room • Dining Room • Kitchen • Hallway • Hallway Bath
ROI Analysis (25 year Period) Case Best Worst Do-it-yourself Initial Investment $ 1,944 1,944 Savings Benefits $ 26,000 26,000 ROI 93% 89%
ROI (25 year period) Case Best Worst Hire a Professional Initial Investment $ 3,900 6,500 Savings Benefits $ 26,000 17,333 ROI 85% 62%
Measures of Success • 1. Satisfaction with design of ceramic tiles selected. • 2. The ability of project members to maintain order and cleanliness to the extent the condo is still livable throughout the life of the project. • 3. The completion of the project within the allotted timeframe. • 4. The completion of the project within the allotted budget. • 5. Due to the physical intensiveness of the project success will also hinge on the ability of project team members to complete the project injury free. • 6. The ability to dispose of waste properly. Dumpsters are located on-site and are available for project use.