80 likes | 350 Views
Full Economic Costing. Directly Incurred CostsCosts which are specific to the project, i.e. would not be occur if the grant did not existCurrent equivalent being full time staff salaries, travel, consumables. Full Economic Costing. Directly Allocated CostsThese are shared costs, i.e. costs which
E N D