Upper and Lower Basin Coordinated Operations Lake Powell Coordinated Operations Water Year 2011 Projected Operations CRFS Technical Committee Meeting November 16, 2010. Lake Powell & Lake Mead Operational Diagrams and Projected Conditions. 3,629. 14.7. 1/1/11 Projection.
E N D
Upper and Lower Basin Coordinated Operations Lake Powell Coordinated Operations Water Year 2011 Projected Operations CRFS Technical Committee Meeting November 16, 2010
Lake Powell & Lake MeadOperational Diagrams and Projected Conditions 3,629 14.7 1/1/11 Projection 1/1/11 Projection 1,086 10.3 1/1/11 Projection 1/1/11 Projection
Annual Operating Plan Lake Powell Unregulated Inflow Scenarios
Water Year 2011 Operations under Interim Guidelines *To achieve Equalization by September 30, 2011, the water year release under the Maximum Probable Inflow forecast is 13.45 maf. The powerplant capacity for WY2011 is estimated to be about 12.93 maf.
Summary of Lake Powell and Lake Mead OperationsReview of 24-Month Study 2011 Water Year Projections In 2011, the Equalization Elevation is 3643 ft.
Glen Canyon Power Plant Planned Unit Outage Schedule for Water Year 2011 (updated 11-01-2010)