SESAME Radiation Safety and PSS

SESAME Radiation Safety and PSS. Phase I : Microtron + Booster Morteza Mansouri on behalf of Safety group TAC 2013. Contents:. Radiation Monitors/Status. FAT was on 3-4 Sep 2013 Now we have 5 movable combined stations (trolleys) ready to be

tavita
Download Presentation

SESAME Radiation Safety and PSS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SESAME Radiation Safety and PSS Phase I : Microtron + Booster Morteza Mansouri on behalf of Safety group TAC 2013

  2. Contents:

  3. Radiation Monitors/Status FAT was on 3-4 Sep 2013 Now we have 5 movable combined stations (trolleys) ready to be connected to PSS. 2 portable Neutrons. Some spare parts. G chamberN chamberDisplay N portable detectorsBridge Roof Service area - Calibrations kit: On site. - 2 Gamma portable detector: expected in days. Passive: - Gamma dosimeters/ SESAME.Service area SR tunnel Neutron TLD’s from Jordan Atomic Energy Commission (JAEC). In addition to an external service from Landauer for both Gamma& Neutrons for comparable issues, expected in one month.

  4. Commissioning permit for Microtron Booster permit: Beginning of 2014

  5. Plan for PSS Based on the experience of similar installation, the safety integrity level required is SIL-3 • PSS equipment: • Two cabinets. (One next to the Booster tunnel door, one in the control room) • Safety PLC modules. (distributed in two cabinets) • Tunnel door switch and lock. • Emergency stop push buttons. (inside tunnel and on the two cabinets) • Safety relays for main interlocks. • Search patrol (search buttons, fence inside tunnel, tunnel evacuation message) • Public address system (inside tunnel and service area, expandable for SR phase) • IP Camera (operator in control room can monitor the status of the tunnel door) • Light indicators. ( Horns and beacons, light panels on tunnel cabinet) • Independent cable tray. • Network for safety devices.

  6. PSS Interlocks: • Safety relays for interlocks: • a- Microtron trigger • b- Microtron high voltage power supply • c- RF interlock • d- Vacuum gate valve • e- Extraction kicker power supply (to be used in SR phase) • 2. Tunnel door switches: • a- Electromagnetic lock • b- Magnetic switch • 3. Interlock signals from each radiation monitor: • a- Low level alarm • b- High level alarm • c- Fault signal

  7. PSS architecture

  8. PSS Status PSS Tender: PSS tender was posted to SESAME website on 26/May/2013 -Considering Technical and financial issues, SAM was Chosen as the contractor - SESAME contracted SAM on 08/October/2013.

  9. SAM (contractor) responsibilities: Providing all the hardware of PSS (excluding cables and conduits). Designing and assembling the two PSS cabinets. (Design done) Programming the PSS PLCs. Preparing a monitoring system for PSS with HMI and Factorytalk view studio software. FAT (25/Dec/2013) SAT in cooperation with SESAME. (End of January 2014) Training SESAME staff for safety PLC programming. Providing the documentation.

  10. SESAME responsibilities: Providing all PSS procedures for the contractor. (done) Preparing I/O list (done) All field cabling and installing cable trays. (PSS cable trays installed, Cable and conduit purchase in progress) Installing the PSS field hardware and connecting the interlock signals to the cabinets terminals. (The hardware is not delivered by the contractor yet; First week of December 2013) Monitoring system for PSS by EPICS (The IOC and main GUI is prepared; in progress) SAT in cooperation with contractor. (End of January 2014) Preparing the final documentation of PSS. (As built documents after PSS commissioning)

  11. APPRICIATE YOUR ATTENTION