Stay informed about the ongoing South Terminal Redevelopment Project at Denver International Airport. Learn about the current phase progress, including excavation, roadway bridge removal, and taxi operation updates. Explore project goals, challenges, and improvements such as the AVI system software upgrade, taxi driver dwell time monitoring, and revenue collection enhancements.
E N D
Denver International Airport South Terminal Project and Taxi Operation Update
Taxi Driver Dwell Time Project Goals: • Upgrade the AVI System Software • Allow Cab Operators to Load / Manage Their Daily Dispatch Lists • Monitor and Report About Drivers’ Dwell / Duty Time
Project challenges • Airport IT / Software vendor interface • Timeline control • Hardware and installation • Communication with taxi operators / PUC • Training for staff and operators