1 / 14

Denver Airport South Terminal Project Update

Stay informed about the ongoing South Terminal Redevelopment Project at Denver International Airport. Learn about the current phase progress, including excavation, roadway bridge removal, and taxi operation updates. Explore project goals, challenges, and improvements such as the AVI system software upgrade, taxi driver dwell time monitoring, and revenue collection enhancements.

tbeatrice
Download Presentation

Denver Airport South Terminal Project Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Denver International Airport South Terminal Project and Taxi Operation Update

  2. South Terminal Redevelopment Project

  3. Current Phase of Project

  4. Excavation of South Grounds

  5. Removal of Terminal Roadway Bridges

  6. Taxi Driver Dwell Time Project Goals: • Upgrade the AVI System Software • Allow Cab Operators to Load / Manage Their Daily Dispatch Lists • Monitor and Report About Drivers’ Dwell / Duty Time

  7. Entrance to the Holding Lot

  8. Installation of Proximity Card Readers

  9. Taxi Dispatch Queue

  10. Revenue Collection Gate

  11. Dispatcher’s Window

  12. Dwell Time and AVI Tag Read Functions

  13. Project challenges • Airport IT / Software vendor interface • Timeline control • Hardware and installation • Communication with taxi operators / PUC • Training for staff and operators

  14. Thank You!Questions?

More Related