140 likes | 164 Views
Denver International Airport. South Terminal Project and Taxi Operation Update. South Terminal Redevelopment Project. Current Phase of Project. Excavation of South Grounds. Removal of Terminal Roadway Bridges. Taxi Driver Dwell Time Project. Goals: Upgrade the AVI System Software
E N D
Denver International Airport South Terminal Project and Taxi Operation Update
Taxi Driver Dwell Time Project Goals: • Upgrade the AVI System Software • Allow Cab Operators to Load / Manage Their Daily Dispatch Lists • Monitor and Report About Drivers’ Dwell / Duty Time
Project challenges • Airport IT / Software vendor interface • Timeline control • Hardware and installation • Communication with taxi operators / PUC • Training for staff and operators