1 / 16

An Analysis Of A Spent Fuel Transportation Cask Under Severe Accident Conditions

An Analysis Of A Spent Fuel Transportation Cask Under Severe Accident Conditions. Christopher S. Bajwa Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Finite Element Modeling Continuous Improvement Workshop May 23, 2002

tea
Download Presentation

An Analysis Of A Spent Fuel Transportation Cask Under Severe Accident Conditions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. An Analysis Of A Spent Fuel Transportation Cask Under Severe Accident Conditions Christopher S. Bajwa Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Finite Element Modeling Continuous Improvement Workshop May 23, 2002 Greenbelt, MD

  2. Introduction • Baltimore Tunnel Fire • Spent Fuel Transportation Cask • Preliminary Results • Conclusions and Future Work 2

  3. Baltimore Tunnel fire • July 18th, 2001 • Howard Street Tunnel • CSX Freight Train • Derailment and Fire • Tripropylene 3

  4. Spent Fuel Transportation Cask • 10 CFR 71.73 Fire Accident • Cask Performance • Finite Element (ANSYS®) Model 4

  5. Spent Fuel Transportation Cask

  6. ANSYS® Model

  7. ANSYS® Model Mesh

  8. Boundary Conditions • Heat Transfer Mechanisms • Initial Conditions • Fire conditions 8

  9. Normal Condition Temperature Profile

  10. 8 Hour Fire Temperature Profile

  11. Cask Component Time vs.Temperature Plot

  12. 8 Hour Fire with 20 Hour Cooldown

  13. Preliminary Results • Fuel Cladding Temperature Limits • Conservative Assumptions 13

  14. Conclusions and Future Work • Cask Performance • Refined Cask Model • Model Tunnel and Railcar • NIST Tunnel Fire Model • Revise Boundary Conditions 14

  15. Refined Cask Model

  16. Acknowledgements • Mr. Thomas E. Michener • Ms. Judith M. Cuta • Mr. Harold E. Adkins, Jr. Pacific Northwest National Labs 16

More Related