An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HIFI consortium meetingGröningen20-21 October 2005High Resolution SpectrometerStatus - Planning

  2. Agenda • HRS_H FM status • HRS_H-FM performances • HRS_V FM/FS progress • Planning • Issues and risks HIFI consortium meeting, Gröningen

  3. HRS_H FM • Fully integrated during June and beginning of July 2005 • TV test performed at LAM/Marseille 18-22 July 2005 • EMC test performed at Intespace 25-29 July 2005 • Physical measurement: Intespace 23 August 2005 • Investigations in progress to solve some non conformances HIFI consortium meeting, Gröningen

  4. TV: results • 4 cycles performed according to the requirements • HRS operates permanently. • Specific testing at 0°, 10°, 20°, 30° and 40°C • Internal temperatures reached compared to the T° of the base plate: • GaAs: +26°C • CMOS: +48°C • Samplers: 14°C • DC/DC converter: 11°C<T<18°C • Three NCR’s issued: • Two bits stuck in the HRS-H correlator (solved) • Problem for cascading the GaAs ASICs (under investigation) • Gain instability (comes from one Converter IF module) HIFI consortium meeting, Gröningen

  5. TV: set up HIFI consortium meeting, Gröningen

  6. EMC: results • CE: compliant • CS: compliant • RE: Some minor non conformances • Non conformance in the notch frequencies (TM/TC frequencies). Already known from the QM program • NCR issued • RS: Rather large susceptibility in the measurement range (4-8 GHz) • Two NCR’s issued • RE: above specifications within the notch frequencies for some setting of LO 13-17 GHz. • RS: susceptibility. Strong reduction by shielding the connectors at the input of the HRS. HIFI consortium meeting, Gröningen

  7. EMC: Radiated Emission • Within the specification except for some frequencies • NCR issued for notch frequencies HIFI consortium meeting, Gröningen

  8. EMC: set up HIFI consortium meeting, Gröningen

  9. Band-width measurements Aliasing The effective bandwidth is 235MHz per sub-band, >> The most appropriate sampling frequency is 490MHz Optimization of the spectral resolution HIFI consortium meeting, Gröningen

  10. Efficiency measurements Efficiency > 75% in the whole band HIFI consortium meeting, Gröningen

  11. Spectral resolution measurements Line-width = 126kHz instead of 120kHz (theoretical) (with fs = 490MHz and Hanning windowing)

  12. TV test - HRS gain versus temperature Gain drift: 0.028dB/°C

  13. TV test with sampling frequency at 490 MHz Errors at cold temperatures The band shape changes slightly with the temperature At 490 MHz the HRS is functional when the temperature is ≥ 10°C HIFI consortium meeting, Gröningen

  14. TV test with sampling frequency at 470 MHz Aliasing At 470 MHz the HRS is functional when the temperature is ≥ 0°C HIFI consortium meeting, Gröningen

  15. HRS_V FM/FS • IF Fully integrated. Will be delivered to CESR end of October • Spare modules: tested. 2 converters may be refurbished at Miteq place, due to the Gain Instability NCR • DC/DC converter ready • ACS: waiting for burn in of samplers for final integration (samplers expected mid of October) HIFI consortium meeting, Gröningen

  16. Planning • Redelivery of IF #1: 1st of October • Vibrations: 13-14 October • Thermal: 10-12 October • EMC: 1 day during week 38 (19-22 October) • Delivery HRS-H: end of October • Delivery of IF #2: end of October • Environmental test program: November/December • Delivery HRS-H: end of december/beg. of January HIFI consortium meeting, Gröningen

  17. Issues and Risks • Samplers: LAT nearly finished. DPA to be done soon at CNES • GaAs: LAT nearly finished. Final electrical tests and DPA to be done • CMOS: NCR open. 2 CMOS ASIC’s failed. Investigations in progress. • IF LNA : Susceptibility needs more investigations. External shielding to be discussed. • IF Converters : Thermal mechanical problem needs to be identified and solved by Miteq. • Performances: • In general good performances. Good improvements compared to the QM model for spurious, resolution, flatness. • Power Consumption reduced to ~66W (vs 72W for QM). Accurate measurements to be done. • Complete characterisation of the HRS still to be done. HIFI consortium meeting, Gröningen