Investigation of canal structures

Investigation of canal structures. Session objectives Spell out the purpose of CM & CD works Describe the procedure for preparation of site survey plan List out various survey techniques adopted Enlist different items to be obtained

Download Presentation

Investigation of canal structures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Investigation of canal structures Session objectives • Spell out the purpose of CM & CD works • Describe the procedure for preparation of site survey plan • List out various survey techniques adopted • Enlist different items to be obtained • Explain the field work to explore LS,CS, Alignment of stream or road etc. and their importance • Speak out the other important items to be taken care of • Explain the need for sub-soil strata exploration and how to depict it on the site survey plan • Discuss about a model check slip • Describe about the brief site survey report

  2. Investigation of canal structures Introduction Purpose Agency Quantification

  3. List of items to be collected • List of Benchmarks • Hydraulic particulars • List of structures existing u/s & d/s of the proposed structure • Index plan • Village plan • Leads of constn. material

  4. Conducting survey work 1.Block leveling • In general a contour map of area about 400 m all-round to a scale of 1cm = 10 m • Specific guidelines are available vide annexure • Contours at 1 m are drawn and interpolated at 0.30 m • Special features viz mounds, dips, & other natural topographical features, presence of monuments etc. are to specifically mentioned in the plan

  5. Conducting survey workContd. 2.Longitudinal section of canal, drain or road • The LS is to be taken 1KM on either side of crossing at the same interval as adopted earlier • The LS is to be plotted to scale of • Horizontal --- 1cm = 10 m • Vertical --- 1 cm = 1 m

  6. Conducting survey workContd. 3. Plan of drain or road • The plan of drain or road is to explore through chain & compass and drawn on the contour plan to know the course 4. Cross sections of drain or road • CS are to taken at 100 m, 200 m, 400 m, & 800 m along the drain with levels at 3m, interval • Useful for computation flood discharges

  7. Conducting survey workContd. 5. Catchment area of the stream • The catchments area of the stream is to actually traced on the ground it is area is less than 1 Sq. Mile with chain & compass using closed traverse • If the catchments area is more than 1 Sq. mile, it is to be obtained from the toposheet

  8. Conducting survey workContd. 6. Other particulars to be furnished • Details of sub-soil strata • Explored through trial pits-number depends on the size of the structure & site condition • A minimum of 3 pits for a small structure-one at both the abutments, one at the pier • Bore holes • Maximum flood levels

  9. Other points to be kept in mind • Possibility of diverting the stream or road • Each crossing is to be treated as an independent one however close they may be • Before commencement of work it is beeter to check the instruments for their accuracy • As far as possible all crossings should be at right angles

  10. 5.Check slip 6. Brief report of the site survey

  11. THAN ‘Q’