410 likes | 492 Views
Reconstruction Results of Z CMS for ME+2. Samir Guragain, Marcus Hohlmann Dept. of Physics and Space Sciences, Florida Institute of Technology, Melbourne, FL 32901 CMS Week December 2007 at CERN [EVO]. Outline. Plots for all ME+2 SLMs in Z CMS at B= 0 T & 4T SLM 2-5 in detail
E N D
Reconstruction Results of ZCMS for ME+2 Samir Guragain, Marcus Hohlmann Dept. of Physics and Space Sciences, Florida Institute of Technology, Melbourne, FL 32901 CMS Week December 2007 at CERN [EVO]
Outline • Plots for all ME+2 SLMs in ZCMS at B= 0 T & 4T SLM 2-5 in detail SLM 1-4 in detail SLM 3-6 in detail • A recent drawing (provided by D. Eartly) Implementation of data from the drawings into SDF • First version of ME+2 SLM 1-4 plot in Rphi is shown. Muon Alignment, CMS Week December 2007 - S. Guragain
ME+2 SLM 2-5 in ZCMSwith 10 measurements at B=0T Note: Laser path straightened PROFILE: http://www.hep.wisc.edu/~jnb/cms/10Oct2007/mep2.html Muon Alignment, CMS Week December 2007 - S. Guragain
Laser hits on CCDs ME+2 SLM 2-5 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain
Laser hits & fitted points Muon Alignment, CMS Week December 2007 - S. Guragain
CSC centers on ME+2 SLM 2-5 in ZCMS at B=0T 2_2_08 Back chamber NO PG 2_2_27 2_1_04 2_1_14 Muon Alignment, CMS Week December 2007 - S. Guragain
Alignment Pins on ME+2 SLM 2-5 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain
Top of the DCOPS on ME+2 SLM 2-5 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain
ME+2 SLM 2-5 in ZCMSwith 7 measurements at B=4T Assuming (Incorrectly) that the TPs do not shift in Z and do not rotate. i.e analog sensors data are not incorporated yet Muon Alignment, CMS Week December 2007 - S. Guragain
ME+2 SLM 1-4 in ZCMSwith 10 measurements at B=0T PROFILE: http://www.hep.wisc.edu/~jnb/cms/10Oct2007/mep2.html Muon Alignment, CMS Week December 2007 - S. Guragain
Laser hits on CCDs ME+2 SLM 1-4 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain
CSC centers on ME+2 SLM 1-4 in ZCMS at B=0T 2_2_20 2_2_03 Back chamber NO PG 2_1_10 2_1_02 Muon Alignment, CMS Week December 2007 - S. Guragain
Alignment Pins on ME+2 SLM 1-4 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain
Top of DCOPS on ME+2 SLM 1-4 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain
ME+2 SLM 1-4 in ZCMSwith 10 measurements at B=4T Assuming (Incorrectly) that the TPs do not shift in Z and do not rotate. i.e analog sensors data are not incorporated yet Muon Alignment, CMS Week December 2007 - S. Guragain
Laser hits on CCDs ME+2 SLM 1-4 in ZCMS at B=4T B=4T Muon Alignment, CMS Week December 2007 - S. Guragain
CSC centers on ME+2SLM 1-4 in ZCMS at B=0T & 4T ~ 6 mm ~ 14 mm Muon Alignment, CMS Week December 2007 - S. Guragain
ME+2 SLM 3-6 in ZCMSwith 10 measurements at B=0T PROFILE: http://www.hep.wisc.edu/~jnb/cms/10Oct2007/mep2.html Muon Alignment, CMS Week December 2007 - S. Guragain
Laser hits on CCDs ME+2 SLM 3-6 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain
CSC centers on ME+2 SLM 3-6 in ZCMS at B=0T 2_1_08 2_1_16 2_2_15 2_2_32 Back Chamber NO PG Muon Alignment, CMS Week December 2007 - S. Guragain
Alignment Pins on ME+2 SLM 3-6 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain
Top of DCOPS on ME+2 SLM 3-6 in ZCMS at B=0T Muon Alignment, CMS Week December 2007 - S. Guragain
ME+2 SLM 3-6 in ZCMSwith 10 measurements at B=4T Assuming (Incorrectly) that the TPs do not shift in Z and do not rotate. i.e analog sensors data are not incorporated yet Muon Alignment, CMS Week December 2007 - S. Guragain
Laser hits on CCDs ME+2 SLM 3-6 in ZCMS at B=4T Muon Alignment, CMS Week December 2007 - S. Guragain
CSC centers on ME+2SLM 3-6 in ZCMS at B=0T & 4T ~ 6.5 mm ~ 14.5 mm Muon Alignment, CMS Week December 2007 - S. Guragain
Fit Residuals All SLMs of ME+2 Z resolution 68 micron Muon Alignment, CMS Week December 2007 - S. Guragain
Fit Pulls • Currently hit errors are set to the larger of: • 17 micron • error on mean of laser profile from MINUIT Muon Alignment, CMS Week December 2007 - S. Guragain
Discrepancies of top of DCOPS and CSCs against PG Muon Alignment, CMS Week December 2007 - S. Guragain
Recent drawing Recent drawings are available on the following link: http://research.fit.edu/hep/FloridaTech_CMS_ME_Alignment_Page.htm By D. Eartly Muon Alignment, CMS Week December 2007 - S. Guragain
ME+2 SLM1-4 in Rphiwith ideal measurements Ideal Muon Alignment, CMS Week December 2007 - S. Guragain
Laser hits on CCDs ME+2 SLM 1-4 in Rphi at ideal Ideal Muon Alignment, CMS Week December 2007 - S. Guragain
ME+2 SLM 1-4 in Rphi with 10 measurements at B=0T PROFILE: http://www.hep.wisc.edu/~jnb/cms/10Oct2007/mep2.html Muon Alignment, CMS Week December 2007 - S. Guragain
Laser hits on CCDs ME+2 SLM 1-4 in Rphi at B=0T Oct 10, 2007 Muon Alignment, CMS Week December 2007 - S. Guragain
Laser hits & fitted points Muon Alignment, CMS Week December 2007 - S. Guragain
Summary • Reconstruction results of ME+2 SLMs in ZCMS are comparable to Photogrammetry (PG) data at 0T. Positions of top of the DCOPS, coded targets on the skin and alignment pins are compared with PG. • Resolution and sensitivity to relative changes 68 micron • Accuracy of CSCs and DCOPS 491 micron (against PG) • Drawings show the detail view of DCOPS dowel pins and alignment pins wrt CSC center. • Reconstruction in Rphi has started to work with correct geometry input. • Immediate Item to take care of Expand Rphi reconstruction to other SLMs. Muon Alignment, CMS Week December 2007 - S. Guragain
Back up Slides Muon Alignment, CMS Week December 2007 - S. Guragain
SLM Configurations:DCOPS Orientations IN IN IN IN OUT OUT OUT OUT IN IN 4 OUT OUT OUT OUT IN IN IN IN IN IN 5 OUT IN OUT OUT OUT IN IN IN IN IN 6 Muon Alignment, CMS Week December 2007 - S. Guragain
Reminder: ME+2 SLM2-5 Muon Alignment, CMS Week December 2007 - S. Guragain
Recent drawings By D. Eartly Muon Alignment, CMS Week December 2007 - S. Guragain
Recent drawings (cont’d) By D. Eartly Muon Alignment, CMS Week December 2007 - S. Guragain
Recent drawings (cont’d) By D. Eartly Muon Alignment, CMS Week December 2007 - S. Guragain