270 likes | 453 Views
2009 Water & Sewer Budget Presentation January 28, 2009. Budget Overview. Water / Sewer Utility Operations Legislative Changes/Challenges Regional Budget Impact Financial Overview 2009 Water / Sewer Rate. Sanitary Sewer. Budget allocations remain focused on sewer side
E N D
2009 Water & Sewer Budget Presentation January 28, 2009
Budget Overview • Water / Sewer Utility Operations • Legislative Changes/Challenges • Regional Budget Impact • Financial Overview • 2009 Water / Sewer Rate
Sanitary Sewer • Budget allocations remain focused on sewer side • Home Inspection Program • Exflow Subsidy Program / Regional Contribution • Flow Monitoring Programs • Exflow Source Identification & Elimination • Manhole Replacement Program
Completed Repair • 400 mm Main Line Sewer • Crescent Park Sewer Shed • Significant Exflow Reduction – Both Dry and Wet Weather Conditions
Manhole Infiltration Infiltration
Manhole Infiltration Infiltration
GRANTS • Average subsidy per home $1400 • Subsidy eligibility is Town wide • $100,000 included in budget (2% rate impact) • Applications to Region & Federal Government Funding Programs
Water Operations • Residential Meter Replacements • Water Quality Monitoring Programs • Cross Connection Control Program • 44 Main Breaks ‘08 / 19 in ‘09 • Hydrant Flow Testing / Painting & Colour Coding • Drinking Water Quality Management System (DWQMS)
Our Annual Communal Drinking Water Inspection Auditwas conducted on June 2, 2008 Our Water Utility Operations continue to satisfy all the legislative requirements of the SDWA and associated regulations.
Legislative Changes Drinking Water Quality Management System (DWQMS) • Develop Operational Plan a) 21 elements b) Gap Analysis c) Risk Assessment • Develop Financial Plan O.Reg. 453/07 • Audit by 3rd Party • Apply for Accreditation • Municipal Drinking Water License
Legislative Challenges • Establishing & Maintaining Compliance • DWQMS • Community Lead Sampling Program • Financial Plan O. Reg. 453/07
Summary- Key Budget Drivers • Water Quality Programs SDWA / DWQMS Compliance • Maintain the Extraneous Flow Focus Home Inspection Program • Commitment to Environmental Protection Through Adopted Practices in CSO Management
Factors Influencing 2009 Budget • Changes in Region’s recovery methodology • Financial sustainability • allocations to reserve funds • Growth in water reserve • PSAB Accounting • Maintenance/repair projects funded through operations
Regional Rate Study for 2009 • Working group of Regional/Area Treasurers and Engineers to review Regional treatment rate alternatives, effective 2009 • Region working group principles in new price structure: • balance consumption risk between Region & Municipalities • minimize shifting of relative burden across municipalities
Regional Budget Impacts • Regional treatment costs represent: - 47% of Town water billing revenue - 65% of Town wastewater billing revenue • Charges reflect 7.5% water / 8.8% wastewater treatment volumes region-wide • Status of Regional Budget • To Regional Council – March 5 • Forecasted increases: • Only ½ water costs quoted as a rate
Financial Overview • Overall Town’s budget increase of 3.2% = $185,000. • Reserves – water to $1.2 m (increase of $362k), no increase to sewer • Debenture costs • Crystal Beach Watermain maturing (decrease of $282k) • 2010 DC recovered debt for Garrison Road Sewers
Financial Overview • Expenses • failure repair and reinstatement costs, wages (increase of $78k) • Continuation of Water Emergency Fund • $10,000 in 2009
Financial Overview –Federal Budget Update • Expansion of Crescent Park Project-ready to go • New Storm in BCF-CC application $3.3m • Replacement Sanitary $1.4m • Replacement Watermain $1.2m • New Program announcement: • $4 billion Infrastructure Stimulus Fund with 50% cost sharing • $2 billion in low-cost loans to finance housing related infrastructure/sewers/water line
Financial Overview - Reserve Status • $1.1 m total sewer & $1.2 m total water annually • 2008 water surplus $228k, sewer surplus $434k • 2009 preliminary water shortfall $45k, sewer shortfall $260k
2009 Water & Sewer Rates • Town gross expenditure increase 3.2%, Region gross expenditure increase 3.4% • Combined - 7.0% water rates; 5.4% sewer base rate • Fees structure that recovers costs and encourages conservation • Increase to average water/sewer customer is $4.21 per month (4.94%) • Average monthly charge - $89.32 based on 18 cubic metre consumption
Recommendations • That the 2009 Water & Sewer Operating Budget attached as Appendix “A” to CBC-05-09 be approved. • That the water & sewer base and consumption rates be increased as per CBC-05-09 (subject to Regional Council approval) effective with billings issued after April 1. • That the Emergency Water Fund be continued with a 2009 budget of $10,000 and $15,000 for 2010 and 2011.