20 likes | 149 Views
The ATS MD part II (Achromatic Telescopic Squeezing scheme). Participants : R. Assmann, R. De Maria, S. Fartoukh, M. Giovannozzi, B. Goddard, P. Hagen, W. Hofle, R. Miyamoto, G. Mueller, S. Redaelli, M. Strzelczyk, R. Steinhagen, R. Tomas,
E N D
The ATS MD part II(Achromatic Telescopic Squeezing scheme) Participants: R. Assmann, R. De Maria, S. Fartoukh, M. Giovannozzi, B. Goddard, P. Hagen, W. Hofle, R. Miyamoto, G. Mueller, S. Redaelli, M. Strzelczyk, R. Steinhagen, R. Tomas, G. Vanbavinckhove, Jorg Wenninger, F. Zimmermann Goal: “Pre-squeeze’’ IR1 and IR5 to b*=1.2 m. Type of beams: fat pilot 1E10, ge<1.5 mm safe beam Machine conditions:ADT off (but for injection oscillations), flat machine most of the time (no X-angle), OFB and QFB switched ON during ramp and squeeze, existing settings for TCP, TCS, TCDQ (relaxed settings for TDI and TCT). Second MD block: 1) Wed 28/06/2011, 04:00/08:00 HWC of injection/ramp/pre-squeeze/squeeze Optics & knobs and full ATS-ramp & ATS-squeeze LSA beam processready (within a few details) down to b*=30 cm at IP1 & b*=1.2 m at IP5 2) Sun 03/07/2011, 00:00/08:00 MD with beam S. Fartoukh, LSWG 24/06/2011