160 likes | 304 Views
Partial Disassembly of the alignment devices on each ME11transfer plate, ME1/1 chamber and ME1/2 chamber. (6 on +Z and 6 on –Z side of the CMS). Disassembly Steps by point. Access with the cherry picker to the position, 20’.
E N D
Partial Disassembly of the alignment deviceson each ME11transfer plate, ME1/1 chamberand ME1/2 chamber.(6 on +Z and 6 on –Z side of the CMS)
Disassembly Steps by point. • Access with the cherry picker to the position, 20’. • Open the cover of the ME11transfer plate Patch Panel, four M4 slotted countersunk (flat) head screws, 10’. • Unplug two Radial ASPDs cables, and one Radial proximity cables, 15’. • Open two covers of the ME11 transfer plate, five M4 slotted countersunk (flat) head screws each, 10’. • Unplug Z and RPhi proximity sensor cables and temperature sensor cables of the transfer plate, 20’. • Unplug of thetwo ME1/2 ASPDs cables, and un-routing cables onthe ME1/2. 25’. • Disassembly ME1/2 chamberASPDs. Two M6 slottedscrews and twopins. 20’. • Disassembly ME11 Z and RPhi proximity sensor and temperature piece of the transfer plate, have two allen M5 screws + two pins holes, 20’. • Unplug R proximity sensor cable of the ME1/1 chamber device, 10’. • Disassembly ME11 chamber device, have two allen M6 screws + two pins holes, 25’. • Disassembly the radial piece, of the +ME11 transfer plate, have two allen M5 screws + two pins holes. Back access too much complicate due to a lot of cables/tubes running around. 1h30’. • Closethecovers of the ME11 transfer plate and thePatch Panel and sealingallremainingdevicesonthisarea. 35’ • Descendwiththecherrypicker. 10’ • Total 5H20’
Assembly Steps • Access with the cherry picker to the position, 20’. • Open the covers of the ME11 transfer plate and the Patch Panel and the sealing. Five M4 slotted countersunk (flat) head screws each, 15’. • Assembly the radial piece, of the ME11 transfer plate, have two allen M5 screws + two pins holes, . Back access too much complicate due to a lot of cables/tubes running around. 2h15’. • Assembly ME1/1 chamber device, have two allen M6 screws + two pins holes, 35’. • Plug R proximity sensor cable of the ME1/1 chamber device, 15’. • Assembly ME1/1 Z and RPhi proximity sensor and temperature piece of the transfer plate, have two allen M5 screws + two pins holes, 25’. • Plug Z and RPhi proximity sensor cables and temperature sensor cables of the transfer plate, 25’. • Assembly ME1/2 chamber ASPDs. Two M6 slotted screws and two pins. 30’. • Plug the two ME1/2 ASPDs cables, and re-routing cables on the ME1/2. 35’. • Close two covers of the ME11 transfer plate, five M4 slotted countersunk (flat) head screws each,15’. • Plug two Radial ASPDs cables, and one Radial proximity cable, 20’. • Close the cover of the +ME11transfer plate PP, four M4 slotted countersunk (flat) head screws, 15’. • Sealing all devices on this area until the start of the next LHC running. 25’ • Descend with the cherry picker. 10’ • Total 7H00’
Open the cover of the ME11transfer plate PP, four M4 slotted countersunk (flat) head screws, 10’.
Open two covers of the +ME11 transfer plate, five M4 slotted countersunk (flat) head screws each, 10’.
Disassembly ME1/2 chamber ASPDs. Two M6 slotted screws and two pins. 20’.
Disassembly ME11 Z and RPhi proximity sensor and temperature piece of the transfer plate, have two allen M5 screws + two pins holes, 20’.
Disassembly ME11 chamber device, have two allen M6 screws + two pins holes, 25’.
Disassembly the radial piece, of the +ME11 transfer plate, have two allen M5 screws + two pins holes, 1h30’.
The accessibility to the back side of the ME11transfer plate it is not easy…