170 likes | 253 Views
SC-214/WG-78. Plenary 9: 14–18 December 2009 Albuquerque. SG Reports. Status of showstoppers Planning for delivery upon completion of Plenary guidance. Basis for approval of mature Draft #2. Intended Use: Basis for FAA Data Communication Program RFP Basis for Prototype Avionics Development
E N D
SC-214/WG-78 Plenary 9: 14–18 December 2009Albuquerque
SG Reports Status of showstoppers Planning for delivery upon completion of Plenary guidance
Basis for approval of mature Draft #2 • Intended Use: • Basis for FAA Data Communication Program RFP • Basis for Prototype Avionics Development • Basis for Verification & Validation Activity NextGen and SESAR
Report from Validation Break-Out Group • TOR Revision • Incorporation of DO-306 – How and Why • Traceability – What and Why • VDL 2 MOPS and MASPS • Tailoring of Security Standards • Segment 2/IP3/EnvB Use Only • No A/G Security Required for Segment 1/IP1 & IP2/EnvA • Target Delivery in Final Standard 2011 • Planning for Segment 3 e.g. Interval Management (M&S) • FLIPINT, HAZWx & D-FLUP • Validation Framework • 214/78 Approach e.g. responsibility of committee vs validation teams, workload, timing • Project Identification – Note who, what, & when • Document Configuration Management – Management of inputs from validation teams and development of proposed disposition • Review Criteria • Intended Use • Status & Planning of FAA Procurement
Tracing Discussions(1) • Tracing at Interoperability Level • For 214/78 gnd systems to provide service to FANS A/C • Included in the interop specs of 214/78 • For 214/78 gnd systems to provide service to L2K A/C • Included in the interop specs of 214/78 • For FANS1/A gnd systems to provide service to 214/78 A/C • TBD • For L2K gnd systems to provide service to 214/78 A/C • TBD • Tracing from INT to SPR (Ch2) • From 214/78 INT – to appls/services/SRs/PRs to Functions of 214/78 • Limitations of 214/78 services for FANS A/C • Eg.Table that subsets the 214/78 SPR reqs for FANS A/C • Limitations of 214/78 services for L2K A/C • Eg.Table that subsets the 214/78 SPR reqs for L2K A/C
Tracing Discussions (2) • Tracing between Standards • Tracing between 214/78 standards to DO306/ED122/ DO258A/ED100A • Tracing between 214/78 standards to 290/ED120 Change1 and 2 / DO280B/ED110B • Tracing between 214/78 standards to DO305/ED154
Incorporation of DO-306/ED122 – How and Why • Integrate DO-306/ED122 content with 214/78 SPR • Develop a convergence package for oceanic and continental data link • First step entails minimum changes to DO-306/ED122 content • No revisions to oceanic operational environment • No revisions to operational, safety, or performance requirements • No revisions to safety analysis • Familiarize the Committee with the oceanic data link • Merge oceanic and continental definitions for convergence so that they can be compared side by side. • Identify differences or gaps, and determine a resolution. • Call for interest for oceanic experts
VDL 2 MOPS and MASPS • Specialized Subgroup to Revise • ICAO VDL 2 Tech Manual • ED-92, • DO-224B and • DO-281A in accordance with AEEC 631-5 to support: • Multiple frequency operations (autotune) • Frequency support list
Planning for coordination with SC186 • SC-186 approved ITP ISRA today • SC-186 to Develop an ISRA, by Dec 2012, for SC-214 to Develop CPDLC for Interval Management e.g.: • Merging and Spacing • Crossing and Passing • In Trail Procedures • SC-186 is Responsible for Safety Assurance and will Deliver Safety and Performance Requirements to SC-214 • 214/78 to Allocate the Safety and Performance Requirements Across ATSU, CSP, and Aircraft.
FLIPINT, D-HZWX & D-FLUP • FLIPINT – In • D-HZWX – In • D-FLUP – Out
Tasks for 2010 • Complete SPR/INT 0.H • Define Validation Strategy • Maintain and evolve the SPR/INT drafts • Revise VDL2 MOPS/MASPs • Oceanic/Continental Integration • Tailoring of security standards for Segment2/IP3 ENVB
Planning 2010 for SGs • Editorial SG • Meeting Toulouse – week of January 11 • Release SPR/INT 0.H • SG completed its tasks • New SGs • Validation Strategy SG • Configuration Control SG • VDL2 MOPS/MASPs SG
Validation Strategy SG • Interface to Validation Projects • Identify validation projects • Establish Minimum Validation Objectives • Ensure that humans and data comm systems on the flight deck and on the ground can meet the requirements of the airspace system • Define a robust and practical controller/pilot environment for E2E human-in-the-loop testing. • Assess adequacy that end-to-end human-in-the-loop is used appropriately and to the extent needed • Develop Validation Cross-Reference Matrix
Change Control SG • Define Template for Validation Projects to Document Issues to be Addressed by the Committee • Prepare Mature Draft 3 • Develop Tracing Material • Incorporate OSA/OPA/INT D-HZWX material • Include Comments after Rev 0.H • Oceanic/Continental Integration
VDL 2 SG • New functions in VDL2 in accordance with AEEC 631-5 • Multiple frequency operations (autotune) • Frequency support list • Revise • ICAO VDL 2 Tech Manual • ED-92 and DO-281A (MOPS) • DO-224B (MASPS)
New SG Meetings in 2010 • First Subgroup Meeting • In Europe • Proposal week of 1-5 March • Host Proposals • DFS Langen • Eurocontrol Brussels • Second SG • In US • Proposal week of 27 September • Host Proposals welcomed