An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CSC Electronics Problem ReportCSCE I&C Fred Borcherding ME I&C -- PC Electronics

  2. Activities • Over the past months two activities have been ongoing • 1 Peripheral Crate + Chamber testing has been in process for –Z • 2 The minus end Slice Test has been in process • Both processes have identified problem PCrate electronics boards • The next slide lists these problems • The following third and forth slides list earlier problems ME I&C -- PC Electronics

  3. List of Problem PCrates & Boards • Date of Entered Location status ID action taken • Action by Location • 1 8-Feb-07 Misha VME-2/3 detector removed DMB0104 We couldn't download the firmware. • 2 22-Feb-07 Misha VME-2/1 detector removed DMB0506 ground potential for CFEB 1,2,4 read >0.25V • 3 5-Mar-07 Misha VME-3/6 detector removed EMUPC0038 1 pin bent, 1 pin in wrong position, slot #20 RAT side • 4 18-Apr-07 Misha VME-1/6 detector removed DMB0490 DMB tests 4,8,9 failed • 5 3-May-07 Misha VME-1/6 detector removed TMB5532 gave CREBrx: 2,6,6,7,7 > wrong • 6 14-May-07 Misha VME-1/4 detector removed DMB0067 didn't enable +3.3V,5V,6V for CFEB#3 • 7 16-May-07 Misha VME-1/2 detector removed DMB0321 Couldn't download the firmware • 8 21-May-07 Misha VME-1/2 detector removed EMUPC0034 couldn't download ALCT firmware through slot #2 • 9 21-May-07 Misha VME-1/2 detector removed MPC0048 the winner bit test failed in all TMB slots • 10 22-May-07 Misha VME-1/3 detector removed TMB5096 STEP not able to read ALCT data through slot #2 • 11 31-May-07 Misha VME-1/1 detector removed DMB0067 didn't enable +3.3V,5V,6V for all CFEBs • 12 4-Jun-07 Misha VME-1/1 detector removed CCB0072 hangs up the system talking to DMB modules in slot #19 • 13 2-May-07 Greg VME-3/3 detector removed DMB0074 ELOG:1939 - Not acting correctly since latest DMB firmware update • 20-May-07 Jianhui B904 Fixed DMB0074 ELOG:2098 - Reload PROM at B904 >> fixed, OK board • 14 2-May-07 Greg VME-2/1 detector removed DMB0400 ELOG:1939 - Not acting correctly since latest DMB firmware update • 20-May-07 Jianhui B904 NOT Fix DMB0400 ELOG:2098 - looks like problem PROM >> board bad ME I&C -- PC Electronics

  4. Earlier Problems - 1 Note: Date shown here is when entered, not when tested • Entry Date of Action Location status Serial N/O A (mfg) comment • 2723 08-Feb-07 ISR problem DMB0016 mechanical problem • 2717 08-Feb-07 ISR problem DMB0053 set aside during ISR testing • 2702 08-Feb-07 ISR problem DMB0057 set aside during ISR testing • 2722 08-Feb-07 ISR problem DMB0128 mechanical problem • 2716 08-Feb-07 ISR problem DMB0209 set aside during ISR testing • 2713 08-Feb-07 ISR problem DMB0221 set aside during ISR testing • 2721 08-Feb-07 ISR problem DMB0229 set aside during ISR testing • 2712 08-Feb-07 ISR problem DMB0259 set aside during ISR testing • 2710 08-Feb-07 ISR problem DMB0276 set aside during ISR testing • 2719 08-Feb-07 ISR problem DMB0303 set aside during ISR testing • 75 30-May-05 B904 problem DMB0304 The front pannel is upside down • 2714 08-Feb-07 ISR problem DMB0325 set aside during ISR testing • 2704 08-Feb-07 ISR problem DMB0332 set aside during ISR testing • 2708 08-Feb-07 ISR problem DMB0337 set aside during ISR testing • 2709 08-Feb-07 ISR problem DMB0338 set aside during ISR testing • 2705 08-Feb-07 ISR problem DMB0340 set aside during ISR testing • 2706 08-Feb-07 ISR problem DMB0343 set aside during ISR testing • 2707 08-Feb-07 ISR problem DMB0355 set aside during ISR testing • 2715 08-Feb-07 ISR problem DMB0363 set aside during ISR testing • 2718 08-Feb-07 ISR problem DMB0427 set aside during ISR testing • 2711 08-Feb-07 ISR problem DMB0438 set aside during ISR testing • 2720 08-Feb-07 ISR problem DMB0524 set aside during ISR testing • 2703 08-Feb-07 ISR problem DMB0531 set aside during ISR testing ME I&C -- PC Electronics

  5. Earlier Problems 2 • Entry ID Date of Action Location status Serial N/O A (mfg) comment • 2726 07-Feb-07 ISR problem EMUPC0021 2 broken connectors on BP • 2689 08-Feb-07 ISR problem EMUPC0021 2 broken connectors on BP back side bottom RAT slots 7 & 8 • 2956 30-Mar-07 X3S41d20 problem RAT5438 replaced RAT in slice test • 813 07-Jun-06 ISR problem TMB5058 fails "CCB Out" Test • 814 07-Jun-06 ISR problem TMB5177 misaligned to backplane • 822 07-Jun-06 ISR problem TMB5465 problem with RAT cards • 824 08-Jun-06 ISR problem VCC0012 fails to download DMB firmware • 827 08-Jun-06 ISR problem VCC0015 fails to download DMB firmware to far DMB • 831 08-Jun-06 ISR problem VCC0021 fails to download DMB firmware • 835 08-Jun-06 ISR problem VCC0025 hangs during TMB/MPC chain test • 834 08-Jun-06 ISR problem VCC0026 fails to download DMB firmware to far DMB • 2701 08-Feb-07 ISR problem CRB0017 failed startup test - • 2700 08-Feb-07 ISR problem CRB0071 broken LV connector - dropped Note: Date shown here is when entered, not when tested ME I&C -- PC Electronics

  6. Summary of Recent Problems • A total of 14 problems were encountered in –Z testing and minus slice test • DMB -> 8 problems • TMB -> 2 problems • MPC -> 1 problems • CCB -> 1 problems • Crate -> 2 problems • These have come from a detailed testing series over 16 pcrates ME I&C -- PC Electronics

  7. Plan • Setting up dedicated board test area @ B904 lab • Multiple PCrates in place • Computer in place • Updating testing software on computer • Ready from 12-June-07 • Single test chamber in place • Procedure at B904 • Re-test each board in known environment • All those listed in all 3 tables above • Give experts a test facility to look at problem boards in detail • Averaging close to 1 problem per crate • Need to determine seriousness of each of these problems • Can we find ways to prevent or to fix these in place in the future ME I&C -- PC Electronics

  8. Backup Slides • Backup slides >> • elog problem entries ME I&C -- PC Electronics

  9. Message ID: 2097     Entry time: Sat May 19 12:50:42 2007 Author:ignatenko, ignatenk@physics.ucla.edu • Type:PC commissioning Subject:Problem with VME-1_2 crate Dear all, last Friday we met a problem that related to peripheral crate itself. We weren't able to "talk" to ALCT on ME-1/1/03 CSC, which were connected to the slots 2 and 3. But we were able to download the ALCT firmware to the chamber and read back all necessary information (like status ALCT) through the slot #4. We tried to talk to ALCT on ME-1/1/04 CSC (this CSC normaly connected to the slot #4) through slot #2 and we failed again. Moreover, whichever TMB or RAT board were inserted into slot #2 they showed the same type of problem. The bottom line - something wrong with PC backplane (most probable something wrong with the connector between the TMB and the RAT boards). We are going to swap VME-1/3 and VME-1/2 crates in the peripheral rack and go on testing trigger sector -1/2. Once we get approval for crate replacement we will replace the PC. ME I&C -- PC Electronics

  10.   Wed May 2 11:20:12 2007, Greg Rakness, Gregory.Rakness@cern.ch, Electronics, swapped DMB ME-2/1/8 and ME-3/1/10   Sun May 20 14:44:40 2007, Jianhui Gu, gujh@mps.ohio-state.edu, Electronics, swapped DMB ME-2/1/8 and ME-3/1/10 • Message ID: 1939     Entry time: Wed May 2 11:20:12 2007     Reply to this: 2098Author:Greg Rakness, Gregory.Rakness@cern.ch • Type:Electronics Subject:swapped DMB ME-2/1/8 and ME-3/1/10 Swapped out boards which are not acting correctly since the DMB firmware update... https://cmsdaq.cern.ch/elog/CSC/1936 ME-2/1/8: removed DMB074, replaced with DMB180 ME-3/1/10: removed DMB400, replaced with DMB300 ME I&C -- PC Electronics

  11. Wed May 2 11:20:12 2007, Greg Rakness, Gregory.Rakness@cern.ch, Electronics, swapped DMB ME-2/1/8 and ME-3/1/10 • Sun May 20 14:44:40 2007, Jianhui Gu, gujh@mps.ohio-state.edu, Electronics, swapped DMB ME-2/1/8 and ME-3/1/10 Message ID: 2098 • Entry time: Sun May 20 14:44:40 2007     In reply to: 1939 Author:Jianhui Gu, gujh@mps.ohio-state.edu • Type:Electronics Subject:swapped DMB ME-2/1/8 and ME-3/1/10 Check these two DMBs in Building 904: DMB#400: The Controller FPGA was not programmed. Reload the PROM, the FPGA is programmed. Tried different ways (single, or broadcast), all worked. So, this is a good board. DMB#074: The controller FPGA was not loaded. Reload the PROM, the FPGA still can NOT be programmed. Load older version of firmware, still can NOT be programmed. The PROM was re-soldered after initial assembly. It looks to me that there was problem with this PROM. So, this is a bad board. Suggestion: replace the PROM. (could be connection?) ME I&C -- PC Electronics