540 likes | 618 Views
CDF. OUTLINE. Riunione CSN1 Assisi: 22 Sett. 2004 Franco Bedeschi INFN-Pisa. Stato del Tevatron Stato del rivelatore Upgrades in corso SVT talk Annovi CPR Computing talk Belforte Output di fisica Richieste finanziarie Situazione ME 2004 Finanziamenti 2005. Extended Tev goals.
E N D
CDF OUTLINE Riunione CSN1 Assisi: 22 Sett. 2004 Franco Bedeschi INFN-Pisa • Stato del Tevatron • Stato del rivelatore • Upgrades in corso • SVT talk Annovi • CPR • Computing talk Belforte • Output di fisica • Richieste finanziarie • Situazione ME 2004 • Finanziamenti 2005 F. Bedeschi, INFN-Pisa
Extended Tev goals • Luminosity plan 2002 • Goals 2002/03 accomplished • Goals 2004 ~ 310 - 380 pb-1 • Result attained! • Tevatron is performing very well • Key is good recycler performance Lmax = 2 x 1032 Base plan ~ no recycler F. Bedeschi, INFN-Pisa
Design and Base Projections 340 pb-1 2004 2003 2002 F. Bedeschi, INFN-Pisa
TeV Luminosity(current situation) 1 x 1032 • Peak luminosity • Best > 1.0 x1032 !!! • Delivered 680 pb-1 • Next data set for analysis • ~ 350 – 450 pb-1 > 3-4 x Run 1 • 540 pb-1 on tape Initial Instantaneous Luminosity • Shutdown in progress • Install electron cooling • FY 2005 • Continue mixed mode • Proton slip stacking • +25% p-bar production acceptance • Commission e-cooling by end of FY05 On tape F. Bedeschi, INFN-Pisa
New wire COT problem • COT has experienced an unexpected gain loss ~ 20%/yr • Chamber has been operated at strongly reduced gain to prevent further damage (Since 2/13/04) Aged SL 2 wire F. Bedeschi, INFN-Pisa
COT problem • Chamber expected to be very radiation hard • Expected currents on SL1 is 4.5 mA/wire @ L = 2x1032 • From 0.15 Coul/cm (2 fb-1) to 0.60 Coul/cm (8 fb-1) • Predict < 1% gain loss at 1 Coul/cm no problem ….. F. Bedeschi, INFN-Pisa
COT problem • Observations and diagnosis: • Gain loss has z and phi dependence • Reversing gas flow reverses pattern of damage • Damage caused by insufficient gas flow? • Actions taken: • Implement gas re-circulation system (80% re-circulated) • Old flow 20 SCF/hr 40 200 • Can push as high as 1000 SCF/hr if needed • Back up plans: • Increase operating temperature 72 82 F • Change gas Ar-CO2 (or even CF4 ?) F. Bedeschi, INFN-Pisa
COT solution • Increased flow did not help much • Added 200 120 ppm O2 on June 16 • Lowered to 80 ppm after 2 weeks • Results are stunning! The COT is completely back in operation. F. Bedeschi, INFN-Pisa
COT solution Start adding oxigen Start increased flow F. Bedeschi, INFN-Pisa
COT solution • Back to January 2002 situation • Wires reanalyzed: • Chemical analysis • Electron microscopy • Observe reverse ageing • Gain situation: • Plateau after 10 days • Uniform in phi and Z F. Bedeschi, INFN-Pisa
Trigger upgrades • Global LV2 upgrade installed by end of 2004 • EVB tests show 1000 Hz LV2 BW reachable • Orders for parts have been made • Rescoped XFT and SVT upgrades presented at director review on July 20-21 • Reviews were impressed and recommended approval F. Bedeschi, INFN-Pisa
Re-scoped SVT Upgrade • Upgrade SVT Data Flow • New AM++ hardware with narrower roads (32K to 512K) reduces number of tracks to fit • Bought by INFN • New AMSequencer/Road Warrior (12 Pulsars) • Interface for AM++ • New Hit Buffer (12 Pulsars) • Faster Track Fitters reduce processing time on found roads (12 Pulsars) Note 12 Pulsars will be “recycled” from current use as “Road Warrior” boards F. Bedeschi, INFN-Pisa
CPR • Module production complete • 52/48 CPR modules done • Much help from Italian techs • 39/48 crack det. modules • HV: • All modules at FNAL • Cables ready – partly shipped • S. Lami setting up control software F. Bedeschi, INFN-Pisa
CPR • Installation in progress: • 10/12 modules installed in first arch • Expect completion by end of shutdown (Mid November) • Italian participation to this phase is critically dependent on travel budget situation! NEW EMPTY, EM Calorimeter face OLD and UGLY F. Bedeschi, INFN-Pisa
CPR • Performance tested with cosmics and final DAQ chain • Observe 12 pe/MIP – Excellent! • Spec was 5 pe/MIP F. Bedeschi, INFN-Pisa
Physics Highlights • List main results • Based on 200 ± 50 pb-1 data sample (until Feb. 13, 2004) • Reach for Bs mixing • Status of publications F. Bedeschi, INFN-Pisa
Electroweak results • Run II: • Major expectations for Mtop and MW • Close or improving Run I results F. Bedeschi, INFN-Pisa
W Mass electron 200 pb-1 muon 200 pb-1 MW(e) = 80.424 ± 0.044 (stat.) ± 0.090 (syst.) GeV MW(m) = 80.419 ± 0.051 (stat.) ± 0.069 (syst.) GeV Run II: MW = 80.421 ± 0.073 GeV (to be blessed) Run I : MW = 80.433 ± 0.079 GeV F. Bedeschi, INFN-Pisa
W mass systematics • Work in progress on recoil model • Work in progress on e-energy scale (passive material) • Now combined error is 76 MeV (stat+syst) • Expect 50 MeV combined (CDF only) by next year • Goal is ~ 20 - 30 MeV/experiment by end of run II F. Bedeschi, INFN-Pisa
Forward W’s Study of forward W’s improved by better tracking and simulation Spring 04 64 pb-1 s =2.874±0.034(stat)±0.167(syst)±0.172(lum) nb 180 pb-1 F. Bedeschi, INFN-Pisa
Top pair Cross sections • Most x-sections updated with ~200 pb-1 in many different channels F. Bedeschi, INFN-Pisa
Final State: 4 jets from W, 2 b-jets (data sample: multi-jets trigger) Large statistics, but huge QCD background: S:B1:2500 Increased S:B by requiring: ET>320GeV Topological cuts (aplanarity, centrality) Event selection efficiency 6.2% S:B 1:24 @ least 1 b-tag jet: S:B 1:4 Measure Xs with 6 jets & 1 b-tag jet All Hadronic Channel F. Bedeschi, INFN-Pisa
Top Mass (l+jets) old SW • Most likely top quark masses determined in each event by Dynamical Likelihood Method. (Same as D0 best run 1 result). • Energy scale systematics is still the dominant issue Mtoprun II = 177.8+4.5-5.0(stat.)±6.2(syst.) = 177.8+7.7-8.0GeV (DLM) Mtoprun I = 176.1 ± 7.3 GeV/c2 (template) Run II checks: Mtop = 179.6 +6.4 -6.3 (stat.) ± 6.8 (syst.) GeV/c2 (multivariate template) Mtop = 174.9 +7.1 -7.7 (stat.) ± 6.5 (syst.) GeV/c2 (template) F. Bedeschi, INFN-Pisa
Top mass systematics and reach Run 1 Run 2 • Systematics still dominated by jet energy scale uncertainty • Expect major reduction by next round of conferences • Goal is 2 – 3 GeV/exp. by end of Run II DLM F. Bedeschi, INFN-Pisa
QCD Inclusive jet cross section Jet Shape / Fragmentation (145 pb-1) jet energy frac. R > 0.3 (KT algorithm) (MidPoint algorithm) F. Bedeschi, INFN-Pisa
SM Higgs, New Phenomena 95% CL limit on doubly charged Higgs production x-section (240 pb-1) 95% CL limit on SM Higgs production cross section (162 - 184 pb-1) F. Bedeschi, INFN-Pisa
B hh • Several new results based on this sample presented at ICHEP • Branching fractions • CP asymmetries • Time dependent CP asymmetries will be next F. Bedeschi, INFN-Pisa
Bhh • Branching ratios and CP asymmetry • Rare two body decay modes F. Bedeschi, INFN-Pisa
Bs States: DG / G • BS J/y fm+m- K+K- • Heavy state and light state decay with distinct angular distributions and different lifetimes. • Decay angular distributions • 1/4 heavy state 3/4 light state • Lifetime - theavy ~ 2 x tlight • .DGS / GS = 0.71 +0.24-0.28 ± 0.01 • Lifetime difference measures “same” CKM element as Dm (oscillation frequency) • Exciting!! Need more data. F. Bedeschi, INFN-Pisa
Bs Mixing reach • Major progress: • Use more Bs final states • Semileptonic is useful • Opposite side taggers established • 30% ct resolution improvement • Expect new relevant limits on Dms next winter F. Bedeschi, INFN-Pisa
Bs hadronic signals Raw yield ~3 pb F. Bedeschi, INFN-Pisa
Bs semileptonic signals F. Bedeschi, INFN-Pisa
ct resolution with L00 • No EbE/L00: • s ~ 67 fs • With EbE/L00: • s ~ 47 fs • 30% improvement F. Bedeschi, INFN-Pisa
SMT tag Mixing and flavor tag • Major progress on mixing: • Test whole machinery on Bd • Consistent Dmd values • Taggers characterized • Combined OST eD2 = 1.6% • Include correlations • Currently developing K tags both on same side and opposite side SST tag F. Bedeschi, INFN-Pisa
Bs Mixing reach Statistical contributions ONLY Baseline = NOW Stretched = NOW+ EbE+ K tag (1%) World limit F. Bedeschi, INFN-Pisa
Run II Publications F. Bedeschi, INFN-Pisa
Charm and Bottom Physics • 4 papers published or submitted • Ds, D+ mass difference (Phys. Rev. D68, 072004, 2003) • Search for D mm (Phys. Rev. D68, 091101, 2003) • Prompt Charm cross section (Phys.Rev.Lett.91, 241804(2003) • Observation of X(3872) - used 220pb-1 (PRL) • 10 analyses in godparent publication review • D0 relative BR and CP asymmetry (123 pb-1) - PRL 2nd draft • Inclusive J/y and B cross sections (40 pb-1) - 1st draft • PentaQuark search: X3/2(1862) X-p+(220 pb-1) • B hadron masses including Bs and Lb (220 pb-1) • BR of LbLcp (65 pb-1) • BR of Bs Dsp / BR of B0 D-p+ (64 pb-1) • BR of Cabbibo suppressed B+ J/y + p • Hadronic Moments in semileptonic B decays (180 pb-1) • BR and CP Asymmetry in B+f K+ and BR in Bsff (180 pb-1) • Time-dependent Amplitude of Bd J/y K* and Bs J/y f and a Lifetime Difference in Bs system (220 pb-1) F. Bedeschi, INFN-Pisa
Top Physics • 1 paper published or submitted • Top cross section in di-lepton (197 pb-1) - PRL • 12 analyses in godparent publication review • Top pair cross-sections in lepton+jets • Kinematics • Secondary vertex b-tag • Secondary vertex b-tag + kinematics - PRL 1st draft • Soft muon b-tag • tau dilepton • Search for anomalous kinematics in dilepton sample • W helicity • Single top • BR(t Wb) / BR(t Wq) • Top mass (162 pb-1) • Dynamic Likelihood (lepton+jets) • Multivariate (lepton+jets) • Template (lepton+jets) F. Bedeschi, INFN-Pisa
Electroweak and QCD Physics • EWK: 1 paper submitted • W, Z cross section in e, m channel (72 pb-1) - PRL • EWK: 7 analyses in godparent publication review • Forward-backward asymmetry in Z/g e+e- (72 pb-1) - PRD 2nd draft • W, Z cross section e, µ channel (72 pb-1), PRD • Wg, Zg cross section e, m channel (202 pb-1) • WW cross section in dilepton channel (197 pb-1) - 1st draft • WZ+ZZ cross section limit (197 pb-1) - 1st draft • W mass (200 pb-1) • W charge asymmetry (170 pb-1) • QCD: 2 analyses in godparent publication review • Jet shapes/energy flow using the MidPoint Algorithm (170 pb-1) • Diphoton cross section F. Bedeschi, INFN-Pisa
Higgs and New Phenomena • 2 papers published or submitted • Bd, Bsµµ (PRL) • Search for H++ ee, µµ, eµ (PRL) • 9 analyses in godparent publication review • e* eg - 1st draft • Search for Z’ ee, µµ • Search for 1st and 2nd generation leptoquarks • Search for leptoquarks in missing ET • WH standard model cross section limit • H diboson cross section limit • Diphoton + missing ET cross section • Magnetic monopole search • Search for sbottom from gluino decay F. Bedeschi, INFN-Pisa
Richieste finanziarie • Situazione ME 2004 • Composizione del gruppo • Prospetto richieste finanziarie • Chiarimenti Frascati • Finanziamenti 2005 • SVT upgrade • MOF F. Bedeschi, INFN-Pisa
Missioni Estere 2004 • Situazione dei gruppi disperata: • Servono TUTTI gli sblocchi! • Si richiede anche un ragionevole finanziamento aggiuntivo Sezione Sblocchi Finanz. Agg. Bo 32.0 0.0 LNF 32.0 20.0 Pd 57.0 0.0 Pi 150.0 30.0Pv dtz 6.0 0.0 Rm 69.0 20.0 Ts 28.0 0.0 Ud 23.5 0.0 F. Bedeschi, INFN-Pisa
Group composition • Slight decrease of number of components, but FTE are almost unchanged relative to 2004 F. Bedeschi, INFN-Pisa
Sommario preventivi • 93 k€ sulle dotazioni di Ferrara per produzione chip SVT Preventivi 2005 Cfr. Metabolismo ???? F. Bedeschi, INFN-Pisa
Frascati? • Richiesta di Frascati sulla COT • Basata sulla grave situazione che si era creata • Il problema sembra risolto e quindi viene meno la necessita’ dell’intervento • Il gruppo della COT ha chiarito in un documento formale che non ritiene necessario questo tipo d’intervento. • Ci aspettiamo che venga presentata un’altra proposta i cui costi andranno valutati al momento opportuno F. Bedeschi, INFN-Pisa
Finanziamenti 2005 • Upgrades • Resta solo SVT (dettagli nel talk di Alberto) • 100 k€ a Pisa per sviluppo e costruzione schede • 93 k€ a Ferrara per la produzione del chip • Consistente con piano finanziario approvato + 40 k€ per compensare minore densita’ di patterns raggiunta • CPR in fase d’installazione e commissioning • Nessuna richiesta a meno d’imprevisti F. Bedeschi, INFN-Pisa
MOF • Next IFC meeting Oct. 18 • Expect situation unchanged relative to last year • Same 250 k€ as last year looks OK F. Bedeschi, INFN-Pisa
Conclusioni • Tevatron alla riscossa! • CDF funziona bene e produce molta fisica • Gli upgrades procedono come da previsioni • Problemi gravi a completare il 2004 con le ME • Richieste 2005 non prentano particolari sorprese F. Bedeschi, INFN-Pisa
Backup Backup slides F. Bedeschi, INFN-Pisa
Tev goals beyond 2003 • Fermilab long range plan (M.Witherell P5 presentation – March 26, 2003) back F. Bedeschi, INFN-Pisa