An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NHQ BIRDDOG

  2. AircraftMaintenance GARY SCHNEIDER LARRY KAUFFMAN NELSON “DAN” DANIEL PAUL SKINNER GARY ARTHURS

  3. SPECIAL GUEST MR. KEVIN PATRICK – Cessna Aircraft Co. MR. STEVE FOWLER – America’s AcftEngs MR. WILLIAM O’HARA – BP Air Inc.

  4. Overview Kevin Patrick – Cessna Aircraft Aircraft Discrepancy Log Compliance Inspection Findings Recent ADs and Service Bulletins CAPR 66-1 Changes

  5. Overview Current Avionics Upgrades Aircraft Rehab Program

  6. Aircraft Discrepancy Log

  7. Compliance Inspection Findings • CAPR 66-1 Supplements • Updated biennially (every two years) • Coordinated through CAP-USAF Liaison Reg • Cessna Door Hinge Pins • Must be factory (CAPR 66-1) • Coat hangers, nails, welding rods • Contact NHQ/LGM for factory pins

  8. Compliance InspectionFindings • Weight and Balance • Missing • Multiple versions (not marked superseded) • Multiple versions (for removable equipment) • Carbon Monoxide Detectors • Missing • Expired date

  9. Compliance InspectionFindings • Tire Pressure • Within 5% of POH • Updated for STCs • Decals for STC Aircraft • Corrosion Control • Exceeding due date • Aircraft Information File • Out of date pages/regs

  10. Compliance Inspections Findings • Survival Kits • Expired items • No specified list of items • IFR Certifications • 24 months exceeded

  11. Recent ADs & Service Bulletins AD 2012-19-01 – Lycoming Crankshafts AD 2012-24-04 – GA8 Wingtip Wiring AD 2012-22-01 – Cessna 172 R&S Fuel Lines AD 2013-11-11 – Cessna Oil Pressure Sw

  12. RecentADs & Service Bulletins SEL 25-01 - AmSafe FMS for 182 POH SEL 74-02 – Slick Magneto Point Assy GA8-2013-99 – Wing Strut Pick-up Ribs SEL 28-01 – Fuel Line Leakage SEL 28-02 - Belly Fuel Drain Fitting

  13. CAPR 66-1 Changes • Corrosion Prevention • Aircraft assigned to Florida, Hawaii & Puerto Rico shall apply a corrosion preventive compound annually, or at the 100hr/annual nearest to the actual due date (whether before of after).

  14. CAPR 66-1 Changes • Corrosion Prevention • All other wings shall apply a corrosion preventive compound biennially, or at the 100hr/annual inspection nearest to the actual due date (whether before or after).

  15. CAPR 66-1 Changes Cessna Oil Pressure Switch Fire Extinguisher Guidance Remove Tow Bar Before Starting Engine Deletion of CAPF 132

  16. Current Avionics Upgrades Artex G406-4 ELT with Nav Interface Rhotheta RT 600 DF Garmin GNS 400W GPS

  17. Aircraft Rehab Program Primarily C172 aircraft C182 & C206 aircraft on exception 5000 or less total airframe hours No corrosion No damage history Aircraft are accepted on a case by case basis

  18. Aircraft Rehab Program Budget and number working are major acceptance factors Rehab aircraft do not automatically return to submitting wing

  19. Aircraft Rehab Program • Current Avionics • G500 EFD • GTN 650 GPS/Waas/Com/Nav • GMA 350H Audio Panel • SL 30 Nav/Com • GTX 33 Transponder • XM Weather

  20. Aircraft Rehab Program Technisonic TDFM 136 FM Rhotheta RT 600 DF

  21. THANKS FOR COMING

  22. Contract Maint Highlights • Contract Shop Repair Allowance • Scheduled inspection - $750 parts and labor • Unscheduled maint - $500 parts and labor • Non Contract Shop Repair Allowance • Any maintenance - $200 • Mid-cycle Oil Change • Tracking Scheduled Maintenance

  23. Contract Maint Highlights • Tracking Time Change & Overhaul Items • WMIRS 108s • Maintenance Test Flights • Non CAP Member Passenger

  24. 180HP Engine STC • Three STC Holders • Penn Yan • Avcon • Air Plains

  25. 180HP Engine STC • Similarities: • Lycoming O360 180hp Engine • Sensenich Fixed Pitch Propeller • Gross Weight Increase to 2550lbs • Flaps Restricted to 30 Degrees

  26. 180HP Engine STC • Differences • STC Installation • Limitations • Flight Manual Supplements

  27. 180HP Engine STC Flight Manual Supplements Gross Weight Increase

  28. New Aircraft • 2012 Glass Cockpit • 17 182T • 2 206H • Assignment • NER – 1 • MER – 1 • GLR - 1

  29. New Aircraft • Assignment (continued) • SER - 1 • NCR – 1 • SWR – 0 • RMR – 1 • PACR - 0

  30. New Aircraft • L23 USAF Academy Gliders • 12 Total • 10 Serviceable • 2 Unserviceable • 8 Trailers • Assignment • TX * UT * NC * IL * NJ