An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BKTZ129083CONSTRUCT CYBER FOCType A-2 Presentation LTC Craig Bradford Base Civil Engineer (BCE) March 19th, 2014

  2. Project Title • Introductions • Meeting Handouts • Current DD1391 • Attendance Sheet

  3. Overview • Project Scope • Construction Costs • AT/FP • Site Plan • Floor Plans • Building Elevations/ Sections • Building Systems • Fire Flow Tests • Soils Report • Environmental Issues • Sustainability/LEED • EPAct/EISA • Renewable Energy • Unresolved Issues • Design Schedule

  4. Authority / Scope FY15 MILCON Sensitive Compartmental Information Facility (SCIF) - 6,900 SF GRAND TOTAL • MCC = $1,522,500

  5. Authority / Scope • LOWER LEVEL FLOOR PLAN • SCIF 3,441 SF

  6. Authority / Scope • UPPER LEVEL FLOOR PLAN • SCIF 3,441 SF

  7. Estimate of Probable Cost • MCC • Base Amount $1,370,250 • Options $152,250 • TOTAL $ 1,522,500 • Cost Estimate • Base Amount $1,440,000 • Options $ 0 • TOTAL $1,440,000

  8. 118th WingNashville, Tennessee Project Location Building735

  9. AT/FP Narrative • Occupancy Type: Primary Gathering • Population – 206 (FOC + IOC) • Density – 1 person / 96 SF (FOC + IOC) • Wall Construction – Reinforced Masonry, Exterior Load Bearing Walls • Setbacks

  10. AT/FP Site Plan

  11. Site Plan

  12. Site Grading & Drainage Site Grading and Drainage is inconsequential

  13. Floor Plan Lower Level Previously Reviewed

  14. Floor Plan Upper Level Previously Reviewed

  15. Building Elevations & Sections

  16. Building Elevations & Sections

  17. Building Elevations & Sections

  18. Building Systems • Structural • Shallow Foundations • Slab on Grade • Exterior and Interior Reinforced Masonry Walls • Steel Joists supporting 2nd Floor • Roofing • Standing Seam Metal Roof • Steel Trusses • Capable of supporting future PV panel loads

  19. Building Systems • Mechanical • High efficiency heat pumps • Remote condensers • Electrical • 208Y/120V, 3-Phase, 4-wire extended form existing IOC building • 4 ftT8, 32W Fluorescent with energy saving lamps and ballast

  20. Fire Protection • Design Requirements • Sprinkler demand: 645 GPM @ 72 psi • Hose stream demand: 250 GPM • Total demand: 895 GPM • Hydrant Flow Test Results • Static pressure: 92 psi • Residual pressure: 63 psi • System flow rate: 1,325 GPM • Existing available flow and pressure can meet the design requirement

  21. Soils Report • 5 Boreholes • Shallow auger refusal (5.6 ft – 16.4 ft) • N-Values (4-15 blows per ft) – soft to stiff • Soft soils require undercutting • Fill soils classified as stiff • Bearing Capacity – 2,500 psf

  22. Environmental Issues • Not an IRP site • No asbestos present • No lead based paint present. • No Threatened or Endangered species affected.

  23. LEED Scorecard 23

  24. Energy Score Sheet

  25. Renewable Energy • Photovoltaic Roof Panels – Not selected. Payback period analysis indicates PV panels are not cost effective. Framing designed to accommodate future panels. • Solar Hot Water – No water services scheduled • Geothermal – Not selected. This is not the most cost effective system based on the Economic Comparison Report

  26. Unresolved Issues • Address all unresolved issues such as • Identification of Additive Bid Items • Check for adequacy of generator set and control house as provided in the IOC project by the government

  27. Construction Phasing There are no phasing requirements

  28. Design Schedule • Criteria Review Conference 10 Jan 14 • Concept Proposal (A1) 25 Feb 14 • Concept Development (A2) 14 Mar 14 • Contract Documents (B1) 9 May 14 • Pre-Final Submittal (B2) 27 Jun 14 • Final Submittal (B3) 8 Aug 14 • Bid Opening 1 Oct 15 • Program Year: FY15

  29. Questions?