Lecture #2: The Design and Construction Team. Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008. AREN 231: Methods and Materials. Diverse Roles of Team. KEY PLAYERS: -OWNER -ARCHITECT -CONSULTING ENGINEERS -CONSTRUCTION MANAGER. Diverse Roles of Team. CONTRACTUAL.
E N D
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials
Diverse Roles of Team KEY PLAYERS: -OWNER -ARCHITECT -CONSULTING ENGINEERS -CONSTRUCTION MANAGER
Diverse Roles of Team CONTRACTUAL CONTRACTUAL NON-CONTRACTUAL
Contractual Roles of Team CONTRACTUAL CONTRACTUAL NON-CONTRACTUAL CONTRACTUAL GENERAL CONTRACTOR CONTRACTUAL PRIME CONTRACTOR OTHER CONSULTING ENGINEERS SUB-CONTRACTORS
The Pre-Design Phase *PROGRAMING *ECONOMIC FEASABILITY *SITE ASSESSMNET *GOVERNMENTAL CONSTRAINTS *DESIGN TEAM SELECTION
The Design Phase *SCHEMATIC DESIGN or SD *DESIGN DEVELOPMENT or DD *CONSTRUCTION DOCUMENT or CD
The Pre-Construction Phase *COMPETITIVE BIDDING *INVITATIONAL BIDDING *NEGOTIATED CONTRACTS *MULTIPLE PRIME CONTRACTS
The Construction Phase *PROPOSE ACCURATE & COMPETITIVE BIDS *PREPARE DETAILED SUBMITTALS FOR APPROVAL *BUILD THE BUILDING & CONSTRUCTION ADMINISTRATION
The Post-Construction Phase *SUBSTANTIAL COMPLETION *CERTIFICATE OF FINAL COMPLETION *RECORD DOCUMENTS
The Owner’s CM is hired to intercept and resolve issues inherent to the design and construction of a building