An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2013 Tech Symposium 1350 Sullivan Trail Easton, PA 18040 610.559.8776 www.avogadro.net Utility MATS Air Toxics Rule An Overview Of Testing and Monitoring Requirements Ed Burgher (eburgher@avogadro.net) Avogadro Environmental Corporation

  2. Avogadro Environmental Company Profile AVOGADRO Environmental Corporation (AEC) … An environmental services firm focusing on ambient air monitoring, stationary source emissions testing and CEMS support. • Client Base • Northeast /Mid-Atlantic Region • Continental United States including Puerto Rico Easton, PA • Operating Divisions • Air Monitoring and Testing • CEM Technical Services

  3. Utility MATS Applicability Overview • 40 CFR Part 63, Subpart UUUUU – NESHAPs: Coal and Oil-fired EGUs • New and existing coal and oil-fired boilers (EGUs) that generate >25 MW for sale to grid • Subject if coal or oil is fired • > 10% of avg. annual HI for 3 consecutive years • > 15% of avg. annual HI for 1 year • If fuel includes any solid waste  CISWI • Compliance date – April 16, 2015 [Existing EGU]

  4. Regulated Parameters – Existing UnitsNon Low Rank or Low Rank Virgin Coal • Antimony • Arsenic • Beryllium • Cadmium • Chromium • Cobalt • Lead • Nickel • Selenium • Manganese • Mercury • Hydrogen Chloride (or sulfur dioxide)* • EGU Must Have FGD and CEMS for SO2 alternative ** If Liquid Oil Fired - Hydrogen Fluoride ** Filterable PM (fPM) Total non-HAP Metals or Individual HAP Metals

  5. Testing/Monitoring Requirements • Conduct initial performance test to demonstrate compliance all pollutant emission limits and determine LEE qualification status • Conduct subsequent performance tests or use CEMS (or CPMS) to demonstrate LEE status • If not LEE qualified, depending on fuel and operation, install CEMS (or CPMS) for non-qualifying parameters or conduct quarterly performance tests • Can’t pursue LEE if: • Unit is New • If EGU has acid gas scrubber & main stack/bypass stack

  6. T/M Requirements Non-LEE, Coal, Solid Oil-Derived EGU • Non-LEE for PM or non-Hg HAP Metals • Install PM CEMS or CPMS or perform fPM test quarterly • If using CPMS, establish site specific operating limit for chosen compliance parameter; use CPMS to demonstrate continuous compliance • Non-LEE for Hg • Install / operate continuous mercury CEMS or Sorbent Trap Sampler per UUUUU, Appendix A

  7. T/M Requirements Non-LEE, Coal, Solid Oil-Derived EGU • Non-LEE for HCl • Conduct initial and quarterly stack test • Install/operate HCl CEMS or • Conduct quarterly HCl performance test or • Or if EGU equipped with wet or dry FGD, may install/operate SO2 CEMS and meet SO2 emission limit • If demonstrating compliance using SO2 CEMS, use 30 BOD data collected before initial compliance date. (Similar initial demonstration using Hg CEMS)

  8. CEMS Requirements • For Hg – Part 63, App A • Initial certification; • Weekly, quarterly, annual QA tests • For HCl – Part 63, App B & Part 60, App B, PS15 • Initial certification; • Daily, quarterly, annual QA tests • For PM CEMS – Part 60, App B – PS11; App F – Procedure 2 • Initial certification; • Daily, quarterly, annual QA tests

  9. PM CPMS Requirements • For PM CPMS – • Initial demonstration – 30 BOD average data • (Existing Units) Set operating limit using highest 1 hour CPMS average during fPM performance test • Re-test / re-assess operating limit annually (3 run fPM test) • Perform routine QA per site-specific QA Plan

  10. LEE Qualification Option - General • Must be a coal-fired, liquid-fired or solid oil-derived fuel-fired EGU or IGCC EGU • Exceptions: • Cannot pursue Hg LEE if the unit is “New” • Cannot pursue LEE if unit is coal-fired, or solid oil-derived fuel-fired EGU or IGCC EGU with acid gas scrubber and main stack/bypass stack exhaust configuration

  11. LEE Qualification Option - General (cont.) Must demonstrate compliance with qualifying LEE emission limits Collect test data to demonstrate compliance with applicable emission limits for HCl, fPM, total non-Hg HAP metals or individual non-Hg HAP metals (or for liquid oil-fired units, total HAP metals or individual HAP metals)

  12. LEE Qualification Requirements • New EGU Qualification as LEE: • All pollutants except Hg must be <50% of applicable emission limits for all required testing for 3 consecutive years • Cannot qualify for Hg LEE • Existing EGU Qualification as an LEE: • All pollutants except Hg must be <50% of applicable emission limits for all required testing for 3 consecutive years • For Hg; • Ave. emissions <10% of applicable emission limit , OR • Hg mass emission PTE ≤ 29 lb/yr and in compliance with applicable Hg limit

  13. LEE Compliance RequirementsInitial Demonstration • Meet general performance testing requirements specified in §63.7(d), (e), (f), and (h). • For all parameters except Hg: Meet testing requirements in §63.10007 – Test Methods and Other Procedures • Via Qtrly Testing or CEMS/CPMS • Must have a site specific test plan • Follow special instructions in 63.1005 (d) and (h) for performance testing when using CEMS or qtrly tests / sorbent traps

  14. LEE Compliance RequirementsInitial Demonstration (continued) • Performance Test For Hg: conduct “30-boiler operating day” test using Method 30B • Can demonstrate on lb/Tbtu or lb/GWh Table 2 emission limit • Perform three equal length tests over the period • Pair of 30B traps can sample up to 10 days • Sampling must be continuous except when exchanging traps or performing required QA • Depending on choice of lb/Tbtu or lb/GWh, also measure • Diluent gas (CO2 or O2) • Stack gas flow rate • Stack gas moisture content • Hourly electrical load • For diluent, flowrate and moisture: if CEMS, record hourly data; if reference method, perform 1 run per BOD

  15. LEE Compliance RequirementsInitial Demonstration (continued) • If a group of affected units vent to a common stack: • Assess LEE individually for each unit, i.e., conduct performance test on each unit in duct prior to common stack Or • Conduct single performance testing in common stack • For unit with a multiple stack or duct configuration and emission controls upstream of multiple stacks or ducts: • Conduct performance test on each stack or duct

  16. Subsequent Demonstration RequirementsLEE Qualified for PM & Non-Hg HAP Metals • For units using PM CPMS to monitor compliance, conduct all applicable tests at least once per year • For all parameters, except Hg, conduct performancetest once every 3 years • For Hg, conduct performance test once per year, e.g., the 30 BOD test

  17. LEE QualificationPerformance Test Methods and Other Procedures • Meet NESHAP general requirements (§ 63.7(d), (e), (f), and (h)) • Need site-specific test plan for any performance test • If using CEMS to meet 30 BOD rolling ave limit, collect unit operating data per applicable work practice standards in §63.10011(g) and Table 3. • Note references for startup, shutdown and operations records and reports – details in §63.10011(g), §63.10021(h) and (i), 63.10031 and §63.10032) • If using performance testing to comply, or if setting PM CEMS operating limit, test at 90 – 110% of design capacity or representative of normal operations

  18. LEE QualificationDetermining Compliance • Use CEMS or CPMS or performance test result • If test result below method defined detection limit, use MDL • For limits in lb/MWh or lb/GWh, calculate pollutant mass emission rate (lb/h) • If Hg CEMS or sorbent trap data are used, calculate emission rate using Subpart UUUUU, Appendix A, equation A-2 or A-3, as appropriate • For all other parameters, use eq. A-2 or A-3 but replace K as specified in 63.10007(e)(3) • If limits in lb/MMBtu or lb/Tbtu, then use F-factors in Method 19. • If no F-factor for parameter in Method 19, then use Part 75 appendix section 3.3.6 or procedures in Part 75 appendix section 3.3.6.

  19. LEE QualificationWhat If LEE Unit Doesn’t Subsequently Re-qualify? • LEE Status is lost and • Except for Hg, conduct quarterly performance tests unless unit runs <168 hours in calendar quarter. • If units operate less than 168 hours in a given quarter, can skip testing for that quarter but testing must be performed at least once per year • For Hg, must install Hg CEMS or Sorbent Trap Monitoring System. • Quarterly testing required until Hg CMS is installed, certified and operating(can skip testing if unit operates <168 hours in a quarter) • Can re-qualify as LEE after performance testing for 3 years demonstrates compliance with standard(s).

  20. If PM LEE Qualified Unit Doesn’t MeetLimits in Subsequent Tests • If performance test for PM or individual or total HAP metals LEE shows emissions >50% of limit, and if reapplying for LEE, • Conduct quarterly emissions tests for filterable PM and individual or total HAP metals for 3 yr period • May skip testing if unit runs less than 168 hrs per quarter • Conduct when it does run >168 hrs in a quarter and • Must test at least once per year

  21. If HClLEE Qualified Unit Doesn’t MeetLimits in Subsequent Tests • For units fired with solid oil-derived fuels and coal-fired EGUs and IGCC EGUs, If performance test on HCl LEE shows emissions >50% of limit, and if reapplying for LEE • Units that don’t use HCl CEMS or alternative SO2 CEMS conduct quarterly emission tests (exceptions/special conditions for units operating <168 hrs per quarter) • For above units that use HCl or alternative SO2 CEMS, collect unit operating data per UUUUU § 63.10011(g) and Table 3

  22. T/M Compliance Strategy Considerations • Initial Compliance • Know your unit: pre-compliance test? • Quality testing • Continuous compliance • Cost of quarterly testing vs. CEMS install/ operation/maintenance costs • Reliability of CEMS • PM CEMS vs. CPMS • Availability of stack testing resources (3 yr LEE qualification) • Quality of stack testing resources (AETB, QSTI)

  23. Summary Rule requires complicated strategy assessment UUUUU requires significant testing and monitoring Qualifying as LEE can reduce long-term CEMS and testing burden However, qualifying requires testing, testing, testing; Pay attention, failures require do over or CEMS install! Once LEE status is attained, pay attention; Recertifying effort as great as for qualifying