Studies Work Group : 2020 Base Case Resource Additions. Thomas Carr August 5, 2010 Studies Work Group Call. Big Picture: 5 Step Process. Load Assumptions BA load forecasts converted to states/provinces State/province adjusted load forecasts for DSM RPS renewable energy requirements

thao
Download Presentation

Studies Work Group : 2020 Base Case Resource Additions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Studies Work Group: 2020 Base Case Resource Additions Thomas Carr August 5, 2010 Studies Work Group Call

  2. Big Picture: 5 Step Process • Load Assumptions • BA load forecasts converted to states/provinces • State/province adjusted load forecasts for DSM • RPS renewable energy requirements • Identify RPS statutes/regulations • Derive total RPS energy targets • Specifying the renewable portfolio • IRP survey by LBNL • Derive the IRP incremental renewable portfolio • Apply CA CPUC/RETI renewable portfolio for CA • Loads and resource balance • Incremental analysis • Subregional analysis • Thermal generation portfolio • Start with existing and under construction generation (Categories 0 & 1) • Add thermal generation to ensure L&R balance • IRP incremental thermal generation • Category 2 generation

  3. Topics A. Resource selection • Update RPS calculations • Update on the LBNL IRP review • IPR incremental renewable portfolio • Update on CA PUC 2020 modeling/renewables B. Load & Resource Balance Check • Incremental analysis initial findings • Subregional model initial findings

  4. Loads & RPS energy targets

  5. Update on loads & RPS • Loads • Recent updates to BPA and others – not reflected in the spreadsheet dated 7-29-10 • State/Provincial adjusted loads for DSM policies -- waiting for final decisions • RPS • July 20 request to SPSC for review of RPS assumptions • Corrections from AZ and CO • Sign off on from NM, WA

  6. LBNL IRP Review • LBNL reviewed 13 IRPs by early June • Resource Planners’ Forum presentation June 21 • LBNL sent out follow up letter with follow up questions to 27 LSEs with • Pete Larson collected responses and created spreadsheet detailing utility IRP/plans generation additions and retirements

  7. Generation additions

  8. Retirements

  9. IRP Incremental Renewable Portfolio • Spreadsheet created with IRP renewable capacity (MW) additions by state/province • Derive energy (MWh) additions from capacity using capacity factors from WREZ model • Sum renewable energy (MWh) additions by states/province • Derive % that IRP renewables contribute to RPS incremental requirement for each state • Accounting for renewables in non-RPS state/provinces • WY – PacifiCorp delivers to UT and OR • ID – IPC sells RECs • BC – self sufficiency policy with export potential • AB – no IRP data, market structure with export potential

  10. CA PUC Modeling/Renewables • “Trajectory” Scenario for 2020

  11. Load & Resource Balance Check • Shift our thinking away from identifying a “gap” with precise quantification of MWs needed 10 years out • Our tools are imprecise to quantify “gap” • Use our tools to identify a range of reasonableness for a loads and resource balance • Tools • Incremental analysis • SubregionalModel

More Related