110 likes | 122 Views
Recovering ECE 400 Andros work (with Roselyne). Kermit arrived Monday 3/29 Touch-screen is damaged – contacting support at Tern for next step Output : Functional old and new Andros and control information. Task 1 – Andros.
E N D
Recovering ECE 400 Andros work (with Roselyne). Kermit arrived Monday 3/29 Touch-screen is damaged – contacting support at Tern for next step Output: Functional old and new Andros and control information Task 1 – Andros
The working code is loaded on the touchscreen and was tested on Andros (hard-wired). Testing successful (=> T/S moved Andros) Next steps: Get touch screen repaired Wirelessly test Andros Task 1 – Andros (con’t.)
Learning Visual C++. Learning RS-232 Visual C++ interface. Output: Functional GUI that sends RS-232 commands. Task 2 – GUI for Andros on Windows XP
Qian has offered to assist with the development of the RS-232 application – arrange meeting with Qian today at meeting!! Task 2 – GUI for Andros on Windows XP
Initial Survey on PTZ cameras (~2 hours): PTZ Cameras Two (2) different PTZ cameras “Domed” “Open” http://www.surveillance-video.com Camera price is a function of: Frames Per Second (FPS) Lines Per Frame Task 3 – PTZ brick
Not Surveyed: Survey and select a processor. Survey and select a wireless module (802.11g, for video). Design and build a PTZ brick. Output: Prototype system completed and design with a report Question: What to look for specifically? Task 3 – PTZ brick
Test 1 taken Did not meet week of 20 June Task 4 – ECE 504
Tuesday afternoon – assisted with removal of Ferris machine shop room Wednesday – tasks for Dr. Abidi Security system for trailer Tool Purchases Thursday – moved room 311 out of SERF Friday – completed tasks from Wednesday Other Tasks
Monday morning – organize, review ECE 504 & maintenance Monday afternoon – Work on Andros (w/ RB) On-going: Motor-Generator removal Other Tasks
Work on Andros – repair of touch screen PTZ continue initial surveys – gather questions GUI development – ECE 504 Bulk of time last week spent on IRIS-West set-up/maintenance Summary
Bulk of time last week spent on IRIS-West set-up/maintenance Summary