1 / 3

Budgets 2012-2013 (and beyond)

Budgets 2012-2013 (and beyond). As sent to directorate for MTP. Present budget. Some notes. For STI, Fellows taken care of in LIU-SPS management and SPS collimation codes, not forgotten

thor
Download Presentation

Budgets 2012-2013 (and beyond)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Budgets 2012-2013 (and beyond) As sent to directorate for MTP

  2. Present budget

  3. Some notes • For STI, Fellows taken care of in LIU-SPS management and SPS collimation codes, not forgotten • Should update all other Fellow/associate/student requests, to assign to either Department, LIU, LIU-SPS or individual activity – action from all to provide information • Requests for support to conferences and workshops – no overall guidelines yet – maybe we can agree something at LIU level. In meantime, would judge that there is some support for ‘specialised’ workshops, e.g. HB2012. • For transport, presently included (or not!) in individual system codes. We should make a separate budget line for this (mainly 200 MHz and ecloud mitigation) • Still not included ‘extra’ 2 MCHF requested for BI fibre cables on 64040, which is needed 2012-2015 – confirmed? To decide soon

More Related