1 / 20

Team PATS Sponsor: PATS Aircraft Contact: Matthew Porter Team Members: Mike Brody Phil Holcombe

Team PATS Sponsor: PATS Aircraft Contact: Matthew Porter Team Members: Mike Brody Phil Holcombe Adam Konneker Nick LaRocca Claire Ngengwe Advisor: Dr. Hartman. Metric Target Value(s) Importance Justification Max Payload ≥ 1000 lbs 1 Project purpose

thu
Download Presentation

Team PATS Sponsor: PATS Aircraft Contact: Matthew Porter Team Members: Mike Brody Phil Holcombe

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team PATS Sponsor: PATS Aircraft Contact: Matthew Porter Team Members: Mike Brody Phil Holcombe Adam Konneker Nick LaRocca Claire Ngengwe Advisor: Dr. Hartman

  2. Metric Target Value(s) Importance Justification Max Payload ≥ 1000 lbs 1 Project purpose Tank Rotation ≥ 360-degrees (one axis) 2 Project purpose Reliability ≥ 99.9% uptime 3 Increase revenue Cost ≤ 10000 USD 4 Increase revenue Dimensions ≤ 12 x 5 x 6 ft (l x w x h) 5 Lean manufacturing Adaptability ≥ 1 Tank Model 6 Lean manufacturing Weight ≤ 500 lbs 7 Easily operable Degrees of Freedom ≥ 1 DOF 8 Easily operable Required Personnel ≤ 2 workers 9 Easily operable

  3. Lifting System Clamping System Rotating System

  4. Steel frame • Bolted HDPE-lined steel clamps • Pulley lifting system

  5. Welded Steel • Interchangeable winch • 4 ft. stroke • Locking Casters

  6. Hand wheel to rotate • Bolts to hold top and bottom • clamps together • 360° Rotation • Polyethylene contact surfaces

  7. Not to be included in prototype • Steel frame • Locking casters • Non-slip surfaces • Sliding center section for • bottom access • Unnecessary to validate concept

  8. Prototype Total Cost Implementation Costs

  9. Tank in neutral position Lifting Mechanism

  10. Clamping System Polyethylene Contacts

  11. Steel Frame Subsystem • Validate Design • Minimize Deflection (Less that 1/2" on uprights) • Lifting Subsystem • Lift and lower BBJ tank 4 feet • Adequate winch ergonomics • Rotation Subsystem • Rotates tank manually 360° • Verify location of tank center of gravity • Overall Safety

  12. Prototype lifted and rotated tank successfully • Clamping system very reliable • Test for center of gravity showed prototype design was off significantly • Winch requires too many rotations (may cause fatigue in operator) • Hand wheel requires too much force to turn (result of center of gravity problem) • Average deflection in uprights was .5” CG

  13. Order parts • Machine components • Assemble final design • Train workers in use and safety • Train operators on safe usage and protocol changes • Implement design into manufacturing process

  14. Change center of gravity on rotation system • Higher quality winch • Taller uprights • Thicker frame tubing • More ergonomic hand wheels

  15. Pats Aircraft • Matt Porter • Calib Janssen • Joe Reinhardt • LT • Advisor • Dr. Hartman • Machine Shop • Steve Beard • Al Lance • Finances • Ann Connor

  16. Testing Protocols

More Related