1 / 5

610000

710000. 700000. 690000. 680000. 670000. Energy consumption total (incl. 2*Hub). [WS]. 660000. 650000. 640000. 630000. 620000. 610000. 1,4. 1,6. 1,8. 2,0. 2,2. 2,4. 2,6. 2,8. Rolling resistance [%]. CSEasy SC20. SC20. 65000. 60000. 55000. [WS]. 50000.

thuong
Download Presentation

610000

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 710000 700000 690000 680000 670000 Energy consumption total (incl. 2*Hub) [WS] 660000 650000 640000 630000 620000 610000 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 Rolling resistance [%] CSEasy SC20 SC20

  2. 65000 60000 55000 [WS] 50000 Energy consumption section 2-3 and 6-7 45000 40000 35000 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 Rolling resistance [%] SC20 CSEasy SC20

  3. 400,00 300,00 200,00 [€] Additional energy cost – 2000 operating hours/year 100,00 0,00 Watts Premia Magnum Solideal Marangoni Eltor 5 Continental Continental SC20 CSEasy SC20 Gumasol Trelleborg Bergougnan Rota VP 15 Softy NP80 Elite XP product

  4. 800,00 600,00 400,00 [€] 200,00 0,00 Watts Premia Magnum Solideal Eltor 5 Marangoni SC20 SC20 Continental Continental CSEasy Gumasol Trelleborg Bergougnan Elite XP Rota VP 15 Softy NP80 product Additional energy cost – 4000 operating hours/year

  5. 1000,00 800,00 600,00 [€] 400,00 200,00 0,00 Premia Watts Solideal Magnum Eltor 5 Marangoni SC20 SC20 Continental Continental CSEasy Gumasol Trelleborg Softy NP80 Elite XP Rota VP 15 Bergougnan product Additional energy cost – 6000 operating hours/year

More Related