An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Taklimat Pelaksanaan Aktiviti Amalan 5S ADTEC Taiping 21-22 Jun 2010 Oleh: Junnaina Binti Husin Chua Muzafar Shah Bin Mohd Shah

  2. INTRODUCTION

  3. OBJECTIVES IMPLEMENTION MAIN OPERATIONS PROBLEM QUALITY EMPLOYABILITY QUALITY EMPLOYABILITY • IMPROVEMENT • Working Habits • Monitoring • Control WHERE? INDIVIDUAL WORKSHOPS WORKPLACE • TOOLS • MS ISO • KAIZEN • TQM FACILITIES TRAINING MATERIALS SUPPLY 5S ACTIVITIES

  4. WHY 5S? • Waste Reduction (Generation, Disposal) • Gain Control (equipment, material & Inventories) • Improvement (Innovation, Kaizen) • Standardize (maintenance, critical parameters, procedures)

  5. TPS: ToyotaProd.System MUDA Wasteful, no add value, unproductive MURA unevenness MURI overburden

  6. T I M W O O D S T : Transportation I : Inventory M : Motion W : Wait O : Over-processing O : Over-production D : Defect S : Searching

  7. WASTE ELIMINATION

  8. 5S MANUAL STRUCTURE STEERING COMMITTEE PILOT TEAM May ~ July 2009 Policy Maker LAUNCHING IMPLEMENTATION SECRETARIATE 1ST GENERATION July 2009 5S TEAM SUPPORTING TEAM 2ND GENERATION Jan 2010 Facilitator Leader Members Audit Promotion Training Implementer Improvement

  9. Example • Team  Bhg. Tek. Mekatronik • Location  Workshop 1 • Schedule

  10. WHAT TO DO? • Preliminary • Seiri • Seiton • Seisou • Seiketsu • Shitsuke

  11. PRELIMINARY • Target Area • Define Workplace • Layout/floor plan • Purpose and Functions • Main Activities • Key persons • Materials required • Evidences • Photos • Data • Target (objectives) • Display Board

  12. Separate items by categories • Stock • Facilities • Location • Documents • Machines • Fittings • Stationeries • Others • Do it with colleague, look for • Wanted vs. Unwanted • Needed vs. Not Needed • Doubt  move it out • Perform Visual Control • Policies  Steering Committee • Categories  easy to relocate SEIRI

  13. Red Tag • Tagging • Unneeded • Unknown usage • Unwanted • Excessive • Defective items • Dead Stock • Sleeping Stock • Leftovers Materials • Evaluation • Is this item needed? • Needed • in what quantity? • how frequent it been used? • Where should it be located? • Not needed • How should it be disposed? • Where to disposed? (Holding area –Gemba, Dept, Institute) • When to disposed?

  14. SEIRI: Checklist

  15. SEITON SEITON • Visual Layout • Look around with colleague • Decide the most effective working flow by frequency • Hourly/Daily • Weekly • Monthly/Yearly • Labeling • Divide the workplace into sections • Frequency of usage • Hourly • Daily • Weekly • Monthly • Type of item • In use • Stock

  16. SEITON • Lines (cont’) • Divider • Outlines • Arrow  Direction, rotation • Limit (max/min  height, weight, qty) • Label • Colour Coding • Item Location • Signs • Equipment related information (SOP) • Showing location, type, qty • Layout • Draw workplace layout • Machine’s location • PIC • Pictures • 4W1H • 30 sec detection • Inform everyone • Lines • Equipment • Supplies • Common Areas • Safety Zones

  17. PLAN • What to clean • Who in-charge • Cleaning method • DO • Cleaning Schedule • Cleaning Tools SEISOU • ACTION • Root Cause • Improvement • Kaizen • CHECK • Reoccurrence (dirt/dust) • Cleaning • Major Cleaning Day (overall) • Daily Routine (10-15 mins) • Weekly/Monthly (specific area) • Cleaning Schedule • Owner Log • Improvement (Progress chart) • Plan • Activities chart • Responsibilities • Checking (4W1H + cause n effect) • Prevent reoccurrence • Preventive Maintenance

  18. Establish guideline (team, visual) • Develop standards • Objective • Team maintain adherence to the standard • How? • 5S Training • Communication Board • Evidence • Visual Standard and procedures • Daily 5 min activities • Weekly 5S application • Performance Measure • Improvement Action • Team Target SEIKETSU