1 / 7

SLHC Optoelectronics Working Group

SLHC Optoelectronics Working Group. News from CMS SLHC upgrades steering group Proposal for a different WG operating mode How about Alice and LHCb?. News from CMS SLHC upgrades steering group. Upgrade plan in two phases By 2012: new triggering layers in pixel tracker

tiffanyp
Download Presentation

SLHC Optoelectronics Working Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SLHC Optoelectronics Working Group News from CMS SLHC upgrades steering group Proposal for a different WG operating mode How about Alice and LHCb? francois.vasey@cern.ch

  2. News from CMS SLHC upgrades steering group • Upgrade plan in two phases • By 2012: new triggering layers in pixel tracker • By 2016: full tracker upgrade • Expression of Interest by end06 • A brief document outlining the case for upgrade, scope of work and timescales. To prepare/warn Funding agencies. • Letter of Intent by mid07 • A larger document with more complete physics case. Includes organization and rough costing. Submitted to LHCC to allow funding agencies to “release” funding • Common projects • Optoelectronics francois.vasey@cern.ch

  3. Proposal for a different operating mode • Move from reporting to collaborating mode • Identify the areas of expertise of collaborators • Collaborate in smaller subgroups, organize topical meetings. • Report at bi-yearly plenary meetings • Prepare common R&D proposals francois.vasey@cern.ch

  4. Optoelectronics WG francois.vasey@cern.ch

  5. Work Package Structure • 1. Physical layer • 1.1 Interface to Front End (hybrids, ...) • 1.2 Data collection/distribution (electrical, optical, wireless....) • 1.3 Data transport (opto components, ser/des, co/dec, drivers/receivers, optohybrids & packages, ...) • 1.4 Interface to Back End (FPGAs, Backplanes, ...) • 2. System layer • 2.1 Design and Simulation (Architectures, Protocols, Error Correction, Data Compression, Synchronous/Asynchronous ...) • 2.2 Demonstrator (Prototypes, Feasibility studies, 4G, 10G, PON) • 2.3 Test (Test systems, protocols, platforms, System tests, Beam tests) • 2.4 Interface to DAQ network (Protocols, modes of operation, ...) • 3. Environment • Radiation Hardness (total dose, SEU,…) • Reliability francois.vasey@cern.ch

  6. Proposed way forward • By Aug 31st, Institutes express their interest to participate to WPa.b and indicate their available resources • On Sep 27th (LECC06 Valencia), the work-packages which have reached critical mass and group two or more institutes can be launched • ATLAS and CMS Funding requests for optoelectronics R&D are commonly reviewed by WG members who sit in CMS or ATLAS SLHC review committees. francois.vasey@cern.ch

  7. ALICE and LHCb? • Opportunity to represent the entire LHC community • Risk to collapse under our own weight. francois.vasey@cern.ch

More Related