1 / 15

Team 9: The Moonshiners

Team 9: The Moonshiners. Our Team. Christian Pfretzschner Mike Handlogten Jason Kraai Brady Rathbun Julie Stoddard. Presentation Overview. Project Reintroduction Design Norms Resources Engineering Analysis Obstacles Progress and Accomplishments Questions.

ting
Download Presentation

Team 9: The Moonshiners

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team 9:The Moonshiners

  2. Our Team Christian Pfretzschner Mike Handlogten Jason Kraai Brady Rathbun Julie Stoddard

  3. Presentation Overview • Project Reintroduction • Design Norms • Resources • Engineering Analysis • Obstacles • Progress and Accomplishments • Questions

  4. Project Reintroduction • Initial Problem • Possible Solutions • Corn Stalks • Switch Grass • Algae • Process Overview Project Reintroduction --- Design Norms --- Resources --- Engineering Analysis --- Obstacles --- Progress

  5. Design Norms • Stewardship • Transparency • Justice Project Reintroduction --- Design Norms --- Resources --- Engineering Analysis --- Obstacles --- Progress

  6. Resources • Dr. Pengcheng Patrick Fu • NATCO Steve Brusso • Alternative Fuels Handbook • Research Literature Project Reintroduction --- Design Norms --- Resources --- Engineering Analysis --- Obstacles --- Progress

  7. Engineering Analysis • Material Balance • 1 Million Liter Basis • Gas Sweetening Basis • Energy Balance • Sun Light Project Reintroduction --- Design Norms --- Resources --- Engineering Analysis --- Obstacles --- Progress

  8. Energy Balance Algae require 240 W/m2 Project Reintroduction --- Design Norms --- Resources --- Engineering Analysis --- Obstacles --- Progress

  9. Obstacles • Separations • Membrane • Heterogeneous Distillation • Adsorption • Azeotrope Fuel-grade ethanol Separation Process Dilute ethanol in water with impurities Project Reintroduction --- Design Norms --- Resources --- Engineering Analysis --- Obstacles --- Progress

  10. Azeotropes Project Reintroduction --- Design Norms --- Resources --- Engineering Analysis --- Obstacles --- Progress

  11. Obstacles • Separations • Membrane • Heterogeneous Distillation • Adsorption • Azeotrope Fuel-grade ethanol Separation Process Dilute ethanol in water with impurities Project Reintroduction --- Design Norms --- Resources --- Engineering Analysis --- Obstacles --- Progress

  12. Obstacles • Potential Process: Membrane Fuel-grade ethanol Distillation Column Membrane Dilute ethanol in water with impurities Project Reintroduction --- Design Norms --- Resources --- Engineering Analysis --- Obstacles --- Progress

  13. Progress and Accomplishments • Preliminary Reactor Design • Feasible Locations and CO2 supply in US • Beginning Economic Analysis for each separation process • Researching and contacting membrane suppliers Project Reintroduction --- Design Norms --- Resources --- Engineering Analysis --- Obstacles --- Progress

  14. Schedule and Cost • Separation Economic Analysis • Hinges on membrane information • Choose Separation Process • Detailed Unit Design • Budget Project Reintroduction --- Design Norms --- Resources --- Engineering Analysis --- Obstacles --- Progress

  15. QUESTIONS?

More Related