An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP5 and WP7WP leader: IGG. Luzi and M. Crosetto

  2. WP5 Tasks and deliverables Two milestones

  3. Links among WP5 and the others WPs

  4. WP5 Participants/specific effort

  5. Volcanic Product generation • Test/geophysical validation on: - Eyjafjallajokull2010(already tested in WP3) - Grimsvotn 2011 (already tested in WP3) - Etna 2011-2012(validation with indipendent Lidar and Doppler radar data) • The product generation for the tests demands detailing the temporal and spatial characteristics of the procedures

  6. Volcanic Product generation: example • The same input products can be obtained with different spatial and temporal resolutions. E.g: Ash Mass map (t/km2) ETNA • User requirements are of main concern (identified as risk number 1). • An accurate description of all data available in the test site for validation purposes are also necessary.

  7. Seismic Product generation • The test on L’Aquila (Italy) earthquake benefits from wide set of data • A validation test site will be decided (D5.1) from different candidates providing similar information.

  8. WP7 - Dissemination • Dissemination plan: • Identification of relevant groups interested in Aphorism results • Dissemination and communication planning with its execution. • - Publication plan, events. - Dissemination material: newsletters format, data and documents exchange tools and related delivery time • Web site main characteristics and contents. • Website: - Link to similar project: e.g SENSUM, IncREO - External tool to disseminate to the wide public. • Intranet: - Repository for all the documentation and information.